From 0aee97b725729fe6efa1ebbf175f0f6a02d2ea3d Mon Sep 17 00:00:00 2001 From: Levi Neuwirth Date: Sun, 9 Aug 2026 15:19:43 +0200 Subject: [PATCH] docs: record PR #227 on the git Stage 1 lane The lane heading still said the PR was not opened. Per the standing correction from #171 and #215, the PR number belongs in the ledger when the PR exists, not when review asks for it. Co-Authored-By: Claude Opus 5 Claude-Session: https://claude.ai/code/session_016bqGA6s9tTUFzYpbeW3tai --- docs/active-work.md | 7 ++++++- 1 file changed, 6 insertions(+), 1 deletion(-) diff --git a/docs/active-work.md b/docs/active-work.md index 3f8cf13..a01d391 100644 --- a/docs/active-work.md +++ b/docs/active-work.md @@ -265,7 +265,12 @@ also removed: this branch's "R8 NEEDS A LANE" investigation block, and durable facts are in the retired registry row and the handoff §6 census. -## Git integration Stage 1 — IMPLEMENTED, gates green, PR not opened +## Git integration Stage 1 — PR #227 OPEN + +**PR #227** — https://github.com/levineuwirth/pmacs/pull/227. Opened +2026-08-09 at `4002734`, after the framing was approved at revision 5 +and the full gate suite went green. Normal review; no merge +authorization. **Written with the lane's first commit, before the PR exists** — the standing correction from #171 and #215. This session it was missed on