Freeze D0-B storage interfaces
This commit is contained in:
parent
5111d655da
commit
f4c787418e
|
|
@ -973,6 +973,11 @@ and every waiter receives one owned clone of the same result. The committed root
|
|||
idempotent subtree merge and carries addressable live pins for every retained artifact so a
|
||||
captured read cannot race reclamation.
|
||||
|
||||
**D0-B was frozen on 2026-07-27 at commit
|
||||
`5111d655da7689c73b3ad3189d9ecb3cd207f888`** after the complete Phase 1 gate returned
|
||||
`GATE_EXIT=0`. B1 NamespaceTxn, B3 StagingSessions, and B4 StoreHarnessB may now dispatch
|
||||
against that surface; changes to it require another contract review here.
|
||||
|
||||
### Phase 1 — storage engine spine
|
||||
|
||||
Lead first defines sealed transaction/frame/snapshot interfaces and file ownership. That deliverable (D0) landed on 2026-07-24 as `crates/levcs-store`: the frozen public API compiling against `StoreError::NotImplemented`, the file-ownership split, strict configuration validation, the single durability syscall funnel with its counters and fault hooks, the failpoint registry in enforced one-to-one correspondence with `oracle::AppendFailpoint`, and the journal-level drive seam that lets the crash harness run in Wave A. The enforced gate is `scripts/check-phase1.sh`, which runs `check-phase0.sh` first so the Phase 0 freeze stays enforced. That work is scoped in `doc/phase1-storage-spine-scope.md`, which realizes this section as a file-ownership matrix, a frozen `levcs-store` API, a physical format and durability/recovery specification, per-package deliverables and acceptance criteria, the Wave A adversarial review charter, and the capacity analysis for P2 on the frozen reference hardware. This plan remains authoritative; that document is the Phase 1 realization of it and lists the decisions that must be resolved before Wave A starts.
|
||||
|
|
|
|||
|
|
@ -5,13 +5,14 @@ The rewrite plan remains authoritative. Where this document is more specific, it
|
|||
lead's Phase 1 realization of the plan; where it appears to contradict the plan, the plan
|
||||
wins and this document is defective.
|
||||
|
||||
Status: **Wave A frozen 2026-07-26 at `5ee9c6b`; Wave B scoped, D0-B implemented and
|
||||
gate-green 2026-07-27.**
|
||||
Status: **Wave A frozen 2026-07-26 at `5ee9c6b`; Wave B scoped, D0-B frozen
|
||||
2026-07-27 at `5111d65`.**
|
||||
Sections 9.1-9.6 were resolved on 2026-07-24 and are recorded there with their conditions;
|
||||
9.7 and 9.8 were ruled on 2026-07-26 and are recorded in §6.9, and contract review
|
||||
2026-07-26-A resolved the `EvidenceHandoffFailure` classification (§6.3). D0-B is complete,
|
||||
its frozen-surface implementation amendments are recorded by contract review 2026-07-27-A,
|
||||
and B1/B3/B4 dispatch is unblocked; no open decision remains. Contract review 2026-07-24-B
|
||||
2026-07-26-A resolved the `EvidenceHandoffFailure` classification (§6.3). D0-B is frozen at
|
||||
`5111d65`, its frozen-surface implementation amendments are recorded by contract review
|
||||
2026-07-27-A, and B1/B3/B4 dispatch is unblocked; no open decision remains. Contract review
|
||||
2026-07-24-B
|
||||
(sections 9.1 and 9.2) has been applied to `bench/result-schema.json` and
|
||||
`bench/reference-hardware.toml` and recorded in the plan document. `crates/levcs-store`
|
||||
exists with the frozen API, the ownership split, the durability funnel, the failpoint
|
||||
|
|
@ -2110,6 +2111,8 @@ D0 lead skeleton, frozen API, sys/failpoint shims, deps, decisions 9.1-9.5
|
|||
D0-B lead: roots.rs, completion.rs, RecoveredShard entry point, adoption handle,
|
||||
lib/deps/options/error/recovery amendments (11 items, 9 touching frozen files)
|
||||
|
|
||||
D0-B frozen 2026-07-27 at 5111d65
|
||||
|
|
||||
+-- B1 NamespaceTxn ---+
|
||||
+-- B3 StagingSessions ---+--> Wave B freeze gate + adversarial review
|
||||
+-- B4 StoreHarnessB ---+ |
|
||||
|
|
@ -2135,8 +2138,8 @@ matrix that can express the class of defect Wave A shipped.
|
|||
|
||||
Sections 9.1-9.6 are resolved, so Wave A was unblocked once D0 landed; 9.7 and 9.8 were ruled
|
||||
on 2026-07-26 in §6.9, and contract review 2026-07-26-A closed the `EvidenceHandoffFailure`
|
||||
conflict. D0-B is implemented and gate-green, so B1, B3, and B4 dispatch is unblocked. The
|
||||
item that was sequenced ahead of A3 —
|
||||
conflict. D0-B is frozen at `5111d65` after a `GATE_EXIT=0` run, so B1, B3, and B4 dispatch
|
||||
is unblocked. The item that was sequenced ahead of A3 —
|
||||
**contract review 2026-07-24-B**, the `result-schema.json` per-flag
|
||||
conditional with its re-pin requirement and the top-level `promotable`, the added
|
||||
`workload.generator` field, and `reference-hardware.toml`'s `store_directory_attributes` —
|
||||
|
|
|
|||
Loading…
Reference in New Issue