Go to file
Levi Neuwirth fcc3fb6b39
P13-S16 amendment 1, review round 1: two documents still described the old state
Both are the one-hop failure the amendment itself is largely about -- the
correction reached the top of each file and stopped.

CONTRACT_P13S16_PROJECTION.md
  The status block was moved to LANDED / RESOLVED, but two screens below it the
  ratification-time framing still read "not the fourth", "nothing is
  implemented", "every gate, test and mutation is specified and none has been
  run", and "4a's landing obligation is outstanding by construction". A reader
  scrolling past the status line met the pre-execution contract presented as
  current.

  Everything from that point to 7 is now marked as a DATED RECORD, S27-style:
  retained rather than rewritten, because the pins are frozen and the review
  records are the review state. The four "what ratification does NOT settle"
  bullets keep their text and gain their outcomes -- t9 confirmed, t8d
  falsified, all gates and mutations run, 4a honoured then discharged at
  3328b2c, and the predicted post-execution amendments being this one.

EVIDENCE_P13S16_EXECUTION.md
  Its header still said it was "deliberately not staged", absent from the touch
  table, and that committing it would need an amendment adding a touch row --
  describing, in the present tense, the state the commit it arrived in had just
  ended. Recast to past tense, pointing at 7's touch row 12.

  The distinction it was drawing survives and is kept: the fourteen paths in
  aee4ff9 are the rung, this is the evidence the rung was reviewed against. It
  documents aee4ff9; it is not part of it.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Ps1szk2mSfgp4Cz21eVH9x
2026-08-10 17:50:42 +02:00
.github/workflows Editor T2 W3: the goldens become conformance gate [9/9] 2026-07-23 17:20:14 -04:00
crates P13-S16 EXECUTED: StaffGroup.members becomes a maintained projection 2026-08-10 17:18:20 +02:00
spec P13-S16 amendment 1, review round 1: two documents still described the old state 2026-08-10 17:50:42 +02:00
spikes/editor-toolkit Packet 2B: both candidates consume the frozen text apparatus 2026-07-30 21:42:05 -04:00
.gitignore Schema major 1 Phase F: ratify engrave I8/I9/I10 + process trail 2026-07-06 17:40:38 -04:00
CLAUDE.md P13-S16 amendment 1: post-landing corrections, consolidated 2026-08-10 17:42:18 +02:00
CONFORMANCE.md Editor T2 W3: the goldens become conformance gate [9/9] 2026-07-23 17:20:14 -04:00
Cargo.lock Editor T4-pre W2: the glyph outlines become a shared typed seam 2026-07-24 18:54:30 -04:00
Cargo.toml T4 round 0: iced is eliminated, and the probe that cleared it proved nothing 2026-07-28 19:01:51 -04:00