epiphany/spec
Levi Neuwirth 0c8b8db1a5 Amend the G-minor contract: the [7f] oracle, and the PDFs the touch table missed
Documentation only. No implementation.

Rules pin 11 as (b) with (a) normative. textproj stays a preserving producer -
it carries the declared manifest version verbatim, never decodes barriers, and
the document author owns updating it when editing opaque barrier bytes.

On top of that, an independent testkit conformance oracle at gate [7f]. When
every barrier blob decodes it recomputes the exact aggregate and requires
equality, not >=: equality is what catches stale over-stamping after a
contributing barrier is removed, which >= cannot see. Both negative fixtures
are required - a tag-31 blob carrying baseline, and removal of the sole maximum
contributor. An undecodable blob is reported not-checkable and never as a pass,
with byte-and-version preservation left to s10/s13 rather than claimed here.
The gate must describe itself as validating known decodable in-tree artifacts,
not as evidence that textproj validates arbitrary edits.

Three new mutations. s16 is deliberately inverted: relaxing equality to >= makes
the over-stamp fixture go green, and that green is the evidence that equality is
load-bearing.

The touch table gains the testkit conformance files and the two tracked PDFs
whose .tex sources change. core_spec.pdf and operation_catalog.pdf stay
build-only for the undefined-references check; if either turns out byte-changed
that is a finding, since this contract changes neither source.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01QjsEnYhm1gPpf6ii2iFxFV
2026-07-28 18:59:00 -04:00
..
vectors Genesis G2a: two settings setters, and the vocabulary's documentation catches up 2026-07-28 17:07:46 -04:00
ANALYSIS_GENESIS_PERSISTENCE.md The operation set absorbs genesis 2026-07-24 15:11:36 -04:00
ANALYSIS_TEXT_RUN_PRIMITIVES.md Editor T4-pre W3: the text run carries both its string and its ink 2026-07-28 14:38:06 -04:00
AUDIT_GMINOR_VOCABULARIES.md Audit the G-minor reachable vocabularies: a ledger, a matrix, one stale sentence 2026-07-28 18:27:35 -04:00
CONTRACT_CORE_DECODE_VECTORS.md The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
CONTRACT_EDITOR_T1A_GOLDENS.md Editor track: the plan, and the T1a golden-harness contract 2026-07-23 14:57:43 -04:00
CONTRACT_EDITOR_T2_SELECTION.md Editor T2: contract for selection v2, the golden gate, and copy/paste 2026-07-23 17:07:18 -04:00
CONTRACT_EDITOR_T3_CARET.md Editor T3: contract for the note-entry caret 2026-07-24 12:55:05 -04:00
CONTRACT_EDITOR_T4PRE_IR.md Editor T4-pre: the IR readiness contract, and the genesis-persistence table 2026-07-24 14:47:08 -04:00
CONTRACT_EDITOR_T4PRE_W2_GLYPHS.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
CONTRACT_EDITOR_T4_SPIKE.md Editor T4 opens: the toolkit spike gets a contract that cannot be argued with 2026-07-28 17:26:23 -04:00
CONTRACT_GENESIS_G1_INSTRUMENT.md Contract G1: one operation, and the two things that make from-empty correct 2026-07-24 18:04:30 -04:00
CONTRACT_GENESIS_G2A_SETTINGS.md Contract G2a round five: the sixth hand-maintained site, and locking Registered 2026-07-28 15:47:17 -04:00
CONTRACT_GMINOR_IMPLEMENTATION.md Amend the G-minor contract: the [7f] oracle, and the PDFs the touch table missed 2026-07-28 18:59:00 -04:00
CONTRACT_GMINOR_VOCABULARY_AUDIT.md Audit contract amendments: a possible gate, and four scoping repairs 2026-07-28 18:08:55 -04:00
CONTRACT_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md P13-S6: the tuning constructions, drafted -- and why sourcing was not enough 2026-07-22 11:50:06 -04:00
CONTRACT_PUSH4B_3BII_IDENTITY.md Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym 2026-07-23 19:30:52 -04:00
CONTRACT_PUSH4B_3BI_WIRE.md Push 4b tranche 3b-i: the score wire opens schema major 3 2026-07-23 17:35:55 -04:00
CONTRACT_PUSH4B_ACCIDENTALS.md Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed 2026-07-23 13:55:19 -04:00
CONTRACT_PUSH4B_ADAPTIVE.md Push 4b: ji-adaptive-5limit resolves, and the blocker was never HarmonicContext 2026-07-24 10:17:46 -04:00
CONTRACT_PUSH4B_PITCHSPACES.md Push 4b tranche 1: contract for the pitch-space slice 2026-07-22 17:08:00 -04:00
CONTRACT_PUSH4B_RESOLVER.md Push 4b tranche 2: contract for the in-memory tuning resolver 2026-07-23 10:06:25 -04:00
CONTRACT_PUSH4B_SPEC1.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
CONTRACT_PUSH4B_TEMPERAMENTS.md Push 4b tranche 2b: contract for the ten historical temperaments 2026-07-23 11:38:14 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
PASS11_RATIFICATION_LOG.md P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md Revise the G-minor scope: the recommended policy could not work 2026-07-28 17:59:56 -04:00
PHASE2_F_WEEK0_WORKLIST.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PLAN_EDITOR_APP.md The latency wall is document-lifetime, not one sitting 2026-07-28 16:27:59 -04:00
PLAN_GENESIS_OPS.md Ratify the G-minor epoch ladder, and narrow the Manifest::SCHEMA rule 2026-07-28 18:39:28 -04:00
PLAN_GMINOR_SCHEMA_MINOR.md Amend the G-minor plan: the seam ruling, the companion consequence, one wrong hash 2026-07-28 18:47:42 -04:00
PLAN_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
QUICKSTART.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
RULING_GENESIS_PERSISTENCE.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
binary_format.pdf Genesis G2a: two settings setters, and the vocabulary's documentation catches up 2026-07-28 17:07:46 -04:00
binary_format.tex Genesis G2a: two settings setters, and the vocabulary's documentation catches up 2026-07-28 17:07:46 -04:00
core_spec.pdf G2a review fixes: a false deviation, and two tests that proved less than claimed 2026-07-28 17:37:43 -04:00
core_spec.tex G2a review fixes: a false deviation, and two tests that proved less than claimed 2026-07-28 17:37:43 -04:00
operation_catalog.pdf Genesis G2a: two settings setters, and the vocabulary's documentation catches up 2026-07-28 17:07:46 -04:00
operation_catalog.tex Genesis G2a: two settings setters, and the vocabulary's documentation catches up 2026-07-28 17:07:46 -04:00
quality_metric_catalog.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.pdf Genesis G2a: two settings setters, and the vocabulary's documentation catches up 2026-07-28 17:07:46 -04:00
text_projection.tex Genesis G2a: two settings setters, and the vocabulary's documentation catches up 2026-07-28 17:07:46 -04:00