..
vectors
Text Projection: whole-document conformance, and a corpus with teeth
2026-07-21 15:44:25 -04:00
CONTRACT_EDITOR_T1A_GOLDENS.md
Editor track: the plan, and the T1a golden-harness contract
2026-07-23 14:57:43 -04:00
CONTRACT_P13S1_LABELS.md
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md
P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic
2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md
P13-S6: the tuning constructions, drafted -- and why sourcing was not enough
2026-07-22 11:50:06 -04:00
CONTRACT_PUSH4B_ACCIDENTALS.md
Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed
2026-07-23 13:55:19 -04:00
CONTRACT_PUSH4B_PITCHSPACES.md
Push 4b tranche 1: contract for the pitch-space slice
2026-07-22 17:08:00 -04:00
CONTRACT_PUSH4B_RESOLVER.md
Push 4b tranche 2: contract for the in-memory tuning resolver
2026-07-23 10:06:25 -04:00
CONTRACT_PUSH4B_SPEC1.md
Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way
2026-07-22 11:49:40 -04:00
CONTRACT_PUSH4B_TEMPERAMENTS.md
Push 4b tranche 2b: contract for the ten historical temperaments
2026-07-23 11:38:14 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md
Text Projection: the document layer, and the equation closes
2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md
Text Projection: the operation layer, and the tests that can see it fail
2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md
P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic
2026-07-22 14:26:08 -04:00
PASS11_RATIFICATION_LOG.md
P12-I2: wire the ratified MUSCLOID layout-object id derivation
2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md
Pass 11: ratify provisional byte choices into normative spec text
2026-06-21 22:30:06 -04:00
PASS12_BATCH.md
Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche
2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md
Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche
2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md
Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed
2026-07-23 13:55:19 -04:00
PHASE2_F_WEEK0_WORKLIST.md
Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate
2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md
Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate
2026-06-23 16:33:39 -04:00
PLAN_EDITOR_APP.md
Editor track: the plan, and the T1a golden-harness contract
2026-07-23 14:57:43 -04:00
PLAN_P13S1_LABELS.md
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md
P13-S2: the alteration is space-relative, and the core fails closed
2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md
Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way
2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md
Text Projection: the document layer, and the equation closes
2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md
Text Projection: the operation layer, and the tests that can see it fail
2026-07-21 13:43:09 -04:00
QUICKSTART.md
Pass 11: ratify provisional byte choices into normative spec text
2026-06-21 22:30:06 -04:00
binary_format.pdf
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
binary_format.tex
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
core_spec.pdf
P13-S6: all twenty tuning systems now say what they mean
2026-07-22 14:54:25 -04:00
core_spec.tex
P13-S6: all twenty tuning systems now say what they mean
2026-07-22 14:54:25 -04:00
operation_catalog.pdf
P13-S2: the alteration is space-relative, and the core fails closed
2026-07-22 09:00:09 -04:00
operation_catalog.tex
P13-S2: the alteration is space-relative, and the core fails closed
2026-07-22 09:00:09 -04:00
quality_metric_catalog.pdf
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
reference_suite.pdf
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
reference_suite.tex
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
text_projection.pdf
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
text_projection.tex
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00