Standalone follow-up to the M2b review: close the pre-existing reanchor /
graph-delete divergence, which unlocks at-scale criterion-1 coverage for the
Group-2 cross-cutting CRUD ops.

The divergence: a DeleteEvent tombstoning a slur/spanner endpoint re-anchored the
structure in the bookkeeping ledger (object stays Live) but materialize_graph_delete
removed it from the graph unconditionally — so the object was Live in
MaterializedState yet gone from the Score. Latent only because graph_edit_session
never created cross-cutting structures.

Fix (graph-materialization only; bookkeeping/convergence unchanged):
- materialize_graph_delete now mirrors reanchor_for_tombstone for slurs and
  spanners: an endpoint-deleted structure re-anchors onto its surviving endpoint
  (stays in the graph) and is removed only when no endpoint survives. A
  two-endpoint structure collapses onto the survivor (degenerate (B,B), but
  reference-clean — the cross-cutting invariant requires only live endpoints;
  proximity-aware target deferred, P11-C5). Ties (cascade) and beams
  (truncate-while->=2) were already consistent and are unchanged. This also fixes
  a latent dangling-spanner bug (spanners weren't handled on event delete at all).
- seed_from_graph records each base-score spanner's event-anchored endpoints in
  `structures`, so a seeded spanner re-anchors through the same rule as a created
  one.

Coverage:
- New reduce_onto tests: deleting one slur endpoint re-anchors in both graph and
  ledger (slur Live + collapsed onto survivor); deleting both cascades in both
  (slur Tombstoned + removed).
- graph_edit_session now creates slurs over replica-0 events and emits
  DeleteCrossCutting / ModifyCrossCutting, so criterion 1 (reduce_onto +
  check_invariants, across delivery permutations) exercises cross-cutting CRUD and
  slur re-anchoring at scale.

Docs: DECISIONS.md records the graph-follows-ledger re-anchoring decision and the
degenerate-collapse / P11-C5 deferral.

Gates: build/fmt/clippy -D warnings clean; cargo test --workspace green (ops
graph_reduction 20; criterion 1 green with cross-cutting wired in); conformance
scale 1 passes. The unrelated Agent-I working tree is left uncommitted; this
commit stages only ops/testkit.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-25 17:23:11 -04:00
.github/workflows Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
crates Agent K: DeleteEvent re-anchoring — make the graph follow the ledger 2026-06-25 17:23:11 -04:00
spec Agent K M2a review follow-up: graph-materialization fixes for the leaf-field ops 2026-06-24 18:25:48 -04:00
.gitignore Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
Cargo.lock Phase 2 (Agent I): visible-slice scaffold — Bravura SVG renderer vs stub 2026-06-23 20:01:40 -04:00
Cargo.toml Phase 2 (Agent I): visible-slice scaffold — Bravura SVG renderer vs stub 2026-06-23 20:01:40 -04:00