epiphany/spec
Levi Neuwirth 430214d619 Pass 13 — P13-D2: tombstone before the graph delete, closing the cue-cascade trail
delete_event tombstoned the event in objects AFTER materialize_graph_delete —
but that graph pass cascades a cue among the event's referents, running
reanchor_for_tombstone over the cue's referents while the source event is still
Live. A slur bridging {X, cue-of-X} therefore re-anchored onto X
(Reanchored{to: X}) and then cascade-deleted when X's tombstone landed a line
later: a contradictory same-effect trail (candidate was "plausible by code
trace, unexecuted" — now executed; reverting the fix reproduces exactly that
two-record trail).

Fix: tombstone the event in objects BEFORE the graph delete, matching the
conventions cascade_cue and tombstone_undo_targets already follow (both
tombstone before their graph delete — which is why the undo path never had this
bug). The bridging slur now sees X already dead during the cue cascade and
cascades once.

Regression: deleting_a_cue_source_does_not_leave_a_contradictory_repair_for_a_
bridging_slur_p13_d2 (built on a cue-bearing base with a bridging slur; asserts
exactly one CascadeDeleted, no Reanchored). Verified to fail without the fix.
940 tests, convergence/conformance green.

PASS13_CANDIDATES.md: P13-D2 resolved — batch CLOSED (all four candidates done).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-08 18:25:37 -04:00
..
PASS11_RATIFICATION_LOG.md P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md Push 3 ratify: extend the slur-rendering requirement + refresh slur_shape 2026-07-08 17:33:11 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md Pass 13 — P13-D2: tombstone before the graph delete, closing the cue-cascade trail 2026-07-08 18:25:37 -04:00
PHASE2_F_WEEK0_WORKLIST.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
QUICKSTART.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
binary_format.pdf Schema major 2 Phase D: ratify the repeat-authoring pair (spec tranche) 2026-07-07 17:31:51 -04:00
binary_format.tex Schema major 2 Phase D: ratify the repeat-authoring pair (spec tranche) 2026-07-07 17:31:51 -04:00
core_spec.pdf Push 3 ratify: extend the slur-rendering requirement + refresh slur_shape 2026-07-08 17:33:11 -04:00
core_spec.tex Push 3 ratify: extend the slur-rendering requirement + refresh slur_shape 2026-07-08 17:33:11 -04:00
operation_catalog.pdf Schema major 2 Phase D: the repeat-authoring pair (code tranche) 2026-07-07 20:06:18 -04:00
operation_catalog.tex Schema major 2 Phase D: the repeat-authoring pair (code tranche) 2026-07-07 20:06:18 -04:00
quality_metric_catalog.pdf Push 3 slur review fix: measure slur_shape on whole slurs, not split fragments 2026-07-08 17:56:11 -04:00
quality_metric_catalog.tex Push 3 slur review fix: measure slur_shape on whole slurs, not split fragments 2026-07-08 17:56:11 -04:00
reference_suite.pdf Schema major 1 Phase A: ratify the v1 wire form + migration (spec only) 2026-07-05 18:05:38 -04:00
reference_suite.tex Schema major 1 Phase A: ratify the v1 wire form + migration (spec only) 2026-07-05 18:05:38 -04:00