epiphany/spec
Levi Neuwirth 4e30fe8475 Contract G1: one operation, and the two things that make from-empty correct
The ladder is ratified, so this contracts its first rung. CreateInstrument is
the single missing link between Score::empty and a note -- CreateStaff already
demands a live Instrument and nothing can create one -- so one kind satisfies
the ruling's acceptance criteria 1 and 3. Instrument holds no outbound entity
references, so the operation needs no referential preconditions at all, only
mint and idempotence.

Enumerating every CreateStaff site turned up two surfaces PLAN_GENESIS_OPS
under-counted: v0.rs's V0OperationKind and migrate.rs in both directions. The
table now lists fifteen, each anchored to its CreateStaff analogue, and all
twenty-two line citations were checked against the working tree.

It also turned up a gap the plan missed. TypedObjectId::Instrument liveness is
already seeded from the base, but there is no instrument_values map, so
byte-identical re-carry against a BASE instrument has nothing to compare. Pin 8
adds one mirroring staff_values at all six of its sites and calls out the
snapshot/restore pair as the silent one -- missing it surfaces only under
undo/replay, which is why i3 tests that case specifically.

Pinned against the traps this project keeps hitting: schema_major is
unconditionally 2 (Instrument's major-2 appends are mandatory, not
Option-hidden, so the value-dependent arm shape would be wrong); the accept-set
stays 2 and epiphany-bundle is untouched, since the raise belongs to G2 alone;
kind 31 and tag 31 coincide by accident, not by rule, and only the tag half is
compile-enforced; and the decode vector is pinned to literal bytes because
round-trip locking cannot see a self-consistent reorder.

Ten tests, each with the mutation that must kill it, plus an explicit note that
i6 documents a designed asymmetry rather than guarding a bug -- base-free
reduction skips referential preconditions because it has no universe to check
against, and a later reader must not "fix" it.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01QjsEnYhm1gPpf6ii2iFxFV
2026-07-24 18:04:30 -04:00
..
vectors The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
ANALYSIS_GENESIS_PERSISTENCE.md The operation set absorbs genesis 2026-07-24 15:11:36 -04:00
CONTRACT_CORE_DECODE_VECTORS.md The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
CONTRACT_EDITOR_T1A_GOLDENS.md Editor track: the plan, and the T1a golden-harness contract 2026-07-23 14:57:43 -04:00
CONTRACT_EDITOR_T2_SELECTION.md Editor T2: contract for selection v2, the golden gate, and copy/paste 2026-07-23 17:07:18 -04:00
CONTRACT_EDITOR_T3_CARET.md Editor T3: contract for the note-entry caret 2026-07-24 12:55:05 -04:00
CONTRACT_EDITOR_T4PRE_IR.md Editor T4-pre: the IR readiness contract, and the genesis-persistence table 2026-07-24 14:47:08 -04:00
CONTRACT_EDITOR_T4PRE_W2_GLYPHS.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
CONTRACT_GENESIS_G1_INSTRUMENT.md Contract G1: one operation, and the two things that make from-empty correct 2026-07-24 18:04:30 -04:00
CONTRACT_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md P13-S6: the tuning constructions, drafted -- and why sourcing was not enough 2026-07-22 11:50:06 -04:00
CONTRACT_PUSH4B_3BII_IDENTITY.md Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym 2026-07-23 19:30:52 -04:00
CONTRACT_PUSH4B_3BI_WIRE.md Push 4b tranche 3b-i: the score wire opens schema major 3 2026-07-23 17:35:55 -04:00
CONTRACT_PUSH4B_ACCIDENTALS.md Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed 2026-07-23 13:55:19 -04:00
CONTRACT_PUSH4B_ADAPTIVE.md Push 4b: ji-adaptive-5limit resolves, and the blocker was never HarmonicContext 2026-07-24 10:17:46 -04:00
CONTRACT_PUSH4B_PITCHSPACES.md Push 4b tranche 1: contract for the pitch-space slice 2026-07-22 17:08:00 -04:00
CONTRACT_PUSH4B_RESOLVER.md Push 4b tranche 2: contract for the in-memory tuning resolver 2026-07-23 10:06:25 -04:00
CONTRACT_PUSH4B_SPEC1.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
CONTRACT_PUSH4B_TEMPERAMENTS.md Push 4b tranche 2b: contract for the ten historical temperaments 2026-07-23 11:38:14 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
PASS11_RATIFICATION_LOG.md P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md The identity cursor is ruled, and three records stop contradicting each other 2026-07-24 15:17:55 -04:00
PHASE2_F_WEEK0_WORKLIST.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PLAN_EDITOR_APP.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
PLAN_GENESIS_OPS.md Scope the genesis operation tranche: a ladder, and one very short first rung 2026-07-24 15:25:25 -04:00
PLAN_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
QUICKSTART.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
RULING_GENESIS_PERSISTENCE.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
binary_format.pdf The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
binary_format.tex The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
core_spec.pdf Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym 2026-07-23 19:30:52 -04:00
core_spec.tex Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym 2026-07-23 19:30:52 -04:00
operation_catalog.pdf P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
operation_catalog.tex P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
quality_metric_catalog.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00