epiphany/spec
Levi Neuwirth 3328b2c0e2
P13-S16 post-acceptance reconciliation: the three documents §4a held back
Contract 4a deliberately kept these out of aee4ff9 because they describe the
state of the repository rather than the change, and staging them during
execution would have asserted that S16 had landed. It has, so they move now.

CLAUDE.md
  - Green baseline 1577 -> 1583, still the single origin for the count.
  - Added: use --no-fail-fast whenever anything is failing. The bare command
    stops at the first failing suite, which is exactly the situation every
    mutation creates -- S16's M6a read six failures over four suites bare and
    seven over all forty-two with the flag.
  - The authority is currently 1, not 0, and a base materialized before S16
    must be rebuilt rather than reused.
  - The bump rule now names BOTH classes it always covered: a change to a
    reduction verdict OR to canonical reduced state. S16 carried one of each,
    and the state-only kind is the easier to overlook while invalidating a
    base just as completely.
  - Two-tracks table: S16 LANDED, with a pointer to its unamended findings.

spec/HANDOFF_2026-08-07.md
  - Chain state and §4.3 item 9 -> LANDED at aee4ff9, each retaining what it
    said before, since the block is a record of what moved.
  - The POST-S27 authority paragraph -> currently 1, both bump classes named.
  - Records the two S16 findings that bite outside their own contract: the
    --no-fail-fast truncation, and invariant 21 abstaining on dangling
    membership rather than detecting the undo hole 0.6 attributed to it.

spec/PASS13_CANDIDATES.md
  - The S16 row is appended to, not rewritten: ACCEPTED AND LANDED at aee4ff9,
    superseding its own "EXECUTED ... NOTHING IS STAGED" sentence, RESOLVED,
    and the six contract findings listed as outstanding follow-up.

The six findings remain unamended against CONTRACT_P13S16_PROJECTION.md. Its
pins are frozen, so each needs its own amendment and review round; recording
them at both ends is what keeps them visible until then.

spec/EVIDENCE_P13S16_EXECUTION.md stays untracked -- no touch row covers it,
and adding one is an amendment, not a keyboard decision.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Ps1szk2mSfgp4Cz21eVH9x
2026-08-10 17:30:27 +02:00
..
vectors Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
ANALYSIS_GENESIS_PERSISTENCE.md The operation set absorbs genesis 2026-07-24 15:11:36 -04:00
ANALYSIS_TEXT_RUN_PRIMITIVES.md Editor T4-pre W3: the text run carries both its string and its ink 2026-07-28 14:38:06 -04:00
AUDIT_GMINOR_VOCABULARIES.md Audit the G-minor reachable vocabularies: a ledger, a matrix, one stale sentence 2026-07-28 18:27:35 -04:00
CONTRACT_CORE_DECODE_VECTORS.md The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
CONTRACT_EDITOR_T1A_GOLDENS.md Editor track: the plan, and the T1a golden-harness contract 2026-07-23 14:57:43 -04:00
CONTRACT_EDITOR_T2_SELECTION.md Editor T2: contract for selection v2, the golden gate, and copy/paste 2026-07-23 17:07:18 -04:00
CONTRACT_EDITOR_T3_CARET.md Editor T3: contract for the note-entry caret 2026-07-24 12:55:05 -04:00
CONTRACT_EDITOR_T4PRE_IR.md Editor T4-pre: the IR readiness contract, and the genesis-persistence table 2026-07-24 14:47:08 -04:00
CONTRACT_EDITOR_T4PRE_W2_GLYPHS.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
CONTRACT_EDITOR_T4_SPIKE.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
CONTRACT_FORMAT_EPOCH_MAJOR1.md Format epoch amended: pin 3c bounds the interval's conformance cost 2026-08-07 11:41:51 -04:00
CONTRACT_GENESIS_G1_INSTRUMENT.md Contract G1: one operation, and the two things that make from-empty correct 2026-07-24 18:04:30 -04:00
CONTRACT_GENESIS_G2A_SETTINGS.md Contract G2a round five: the sixth hand-maintained site, and locking Registered 2026-07-28 15:47:17 -04:00
CONTRACT_GENESIS_G2B_TUNING.md Sign t9 with a mutation that actually kills it 2026-07-29 10:18:57 -04:00
CONTRACT_GENESIS_G3A_ENTITIES.md G3a contract: ten source locators, corrected forward 2026-07-31 19:47:43 -04:00
CONTRACT_GENESIS_G3A_UNDO_REPAIR.md G3a undo repair: the tombstone branch was reachable all along 2026-07-29 18:21:45 -04:00
CONTRACT_GENESIS_G3B_MEASURE.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_GMINOR_IMPLEMENTATION.md Amend the G-minor contract: the [7f] oracle, and the PDFs the touch table missed 2026-07-28 18:59:00 -04:00
CONTRACT_GMINOR_VOCABULARY_AUDIT.md Audit contract amendments: a possible gate, and four scoping repairs 2026-07-28 18:08:55 -04:00
CONTRACT_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md P13-S6: the tuning constructions, drafted -- and why sourcing was not enough 2026-07-22 11:50:06 -04:00
CONTRACT_P13S16_PROJECTION.md P13-S16 RATIFIED after twelve independent rounds; pins frozen, not dispatched 2026-08-09 20:55:00 +02:00
CONTRACT_P13S18_MATRIX.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_P13S19_PARTIAL.md P13-S19: what a partial measure actually costs 2026-07-31 18:13:44 -04:00
CONTRACT_P13S22_TAGLOCK.md P13-S22 contract: M2's whole-test alternative was false 2026-07-31 19:30:21 -04:00
CONTRACT_P13S27_REDUCTION_AUTHORITY.md P13-S27: accept reduction authority implementation 2026-08-09 15:05:58 +02:00
CONTRACT_PUSH4B_3BII_IDENTITY.md Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym 2026-07-23 19:30:52 -04:00
CONTRACT_PUSH4B_3BI_WIRE.md Push 4b tranche 3b-i: the score wire opens schema major 3 2026-07-23 17:35:55 -04:00
CONTRACT_PUSH4B_ACCIDENTALS.md Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed 2026-07-23 13:55:19 -04:00
CONTRACT_PUSH4B_ADAPTIVE.md Push 4b: ji-adaptive-5limit resolves, and the blocker was never HarmonicContext 2026-07-24 10:17:46 -04:00
CONTRACT_PUSH4B_PITCHSPACES.md Push 4b tranche 1: contract for the pitch-space slice 2026-07-22 17:08:00 -04:00
CONTRACT_PUSH4B_RESOLVER.md Push 4b tranche 2: contract for the in-memory tuning resolver 2026-07-23 10:06:25 -04:00
CONTRACT_PUSH4B_SPEC1.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
CONTRACT_PUSH4B_TEMPERAMENTS.md Push 4b tranche 2b: contract for the ten historical temperaments 2026-07-23 11:38:14 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
HANDOFF_2026-08-07.md P13-S16 post-acceptance reconciliation: the three documents §4a held back 2026-08-10 17:30:27 +02:00
PASS11_RATIFICATION_LOG.md P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md P13-S16 post-acceptance reconciliation: the three documents §4a held back 2026-08-10 17:30:27 +02:00
PHASE2_F_WEEK0_WORKLIST.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PLAN_EDITOR_APP.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
PLAN_GENESIS_OPS.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
PLAN_GMINOR_SCHEMA_MINOR.md P13-S21: the two precondition reasons the wire spec never named 2026-07-30 20:57:59 -04:00
PLAN_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
QUICKSTART.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
RULING_GENESIS_PERSISTENCE.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
binary_format.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
binary_format.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
core_spec.pdf P13-S16 EXECUTED: StaffGroup.members becomes a maintained projection 2026-08-10 17:18:20 +02:00
core_spec.tex P13-S16 EXECUTED: StaffGroup.members becomes a maintained projection 2026-08-10 17:18:20 +02:00
operation_catalog.pdf P13-S16 EXECUTED: StaffGroup.members becomes a maintained projection 2026-08-10 17:18:20 +02:00
operation_catalog.tex P13-S16 EXECUTED: StaffGroup.members becomes a maintained projection 2026-08-10 17:18:20 +02:00
quality_metric_catalog.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
text_projection.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00