Go to file
Levi Neuwirth 4132a7ac05 Inter-staff review fix: make staff attribution y-aware (stems tore off)
Self-review of the inter-staff solve found a real bug: stroke->staff attribution
reused component_glyph, whose fallback picks the nearest glyph by X ALONE. That
is correct for a SLOT — both staves of a system share their x columns, hence
their spring slots, so the horizontal delta is the same either way — but wrong
for a STAFF: it handed a lower-staff stem to the UPPER staff's notehead. The
stem then kept the wrong vertical shift and tore off its own head (measured
worst stem->notehead distance 5.837 on the two-staff fixture vs 1.150, the stem
x-inset, on the single-staff one), and it polluted the upper staff's content
extent, inflating the computed gap.

Fix: the staff attribution uses a 2-D nearest for that fallback (a ledger still
resolves via owning_glyph's shared Pitch source; a staff line via its Staff
source). component_glyph is unchanged and still serves the horizontal path.

Also corrected: staff-attributed primitives now contribute their y ONLY through
the shifted path (Extent::add_x for x, add_y for the shifted staff extent), so a
lower staff's UNSHIFTED content can no longer inflate a system's max_y. Dead
Extent::add removed.

The corrected attribution yields a smaller, more accurate separation (two-staff
view_box height 36.1 -> 31.1). Regression multi_staff_stems_stay_on_their_own_
staff (verified to fail at 5.837 without the fix). Only the two-staff engrave
golden churned; single-staff goldens byte-stable. 948 tests, clippy 0, docs
-D warnings, conformance 8/8.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-09 09:42:51 -04:00
.github/workflows Push 4: Binary Format companion, F1 benches, subquadratic reduction order 2026-07-02 19:02:07 -04:00
crates Inter-staff review fix: make staff attribution y-aware (stems tore off) 2026-07-09 09:42:51 -04:00
spec Pass 13 — P13-D2: tombstone before the graph delete, closing the cue-cascade trail 2026-07-08 18:25:37 -04:00
.gitignore Schema major 1 Phase F: ratify engrave I8/I9/I10 + process trail 2026-07-06 17:40:38 -04:00
CONFORMANCE.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
Cargo.lock Phase 3 tranche 2: quality conformance companions, real metrics, multi-system click fix 2026-07-03 10:39:05 -04:00
Cargo.toml Push 4: Binary Format companion, F1 benches, subquadratic reduction order 2026-07-02 19:02:07 -04:00