epiphany/spec
Levi Neuwirth 480a299438
P13-S27 amendment 7: a single source is created by deleting the others
The independent review of amendment 6 returned two findings; the sweep found
a third. Three findings, all blocking. All three are failures of the
invariant amendment 5 introduced and amendment 6 refined.

1. The invariant contradicted five older standing instructions. It says only
   the most recent amendment needs a pass, while amendments 1-5 each still
   ended "this amendment needs another independent pass" -- five live
   commands, all false -- plus amendment 2's order to re-run gates 4 and 4a,
   already carried out twice.

   All closers rewritten as dated records: "Status when written (CLOSED) ...
   its pass closed as execution review N." The invariant now states outright
   that the amendment blocks carry no live status and none may be added.

2. The invariant's locator could not identify the pending amendment. It said
   read "the last row" of the history table, but the literal last row is
   Total, and the last review row names "execution review 6" -- an event,
   not an amendment. The rule could not be followed to an answer.

   Fixed: the last execution review row, immediately above Total, and the
   amendment it produced carries the same number -- review N produced
   amendment N, one per row, by construction.

3. Sweep: amendment 6's own closer had the same defect. The review named
   amendments 1-5; amendment 6's said "amendment 6 needs the next
   independent pass" -- true when written, false the moment amendment 7
   existed. Fixing only the five would have rebuilt the contradiction on
   this commit. Six closers, not five.

Finding 1 is the failure mode at its clearest. Amendment 5 removed a count
and wrote an invariant to own it; amendment 6 refined the invariant; neither
swept the five places already answering the question the invariant claimed to
own. A single source of truth is not created by declaring one -- it is
created by deleting the others. That has now had to be learned three times:
for counts, for figures in general claims, and now for instructions.

Finding 3 generalises the review's own scope gap: a correction that fixes
every currently-false instance of a claim but leaves the one instance that is
currently true has scheduled its own recurrence, because the true one goes
false on the next event. Correct by class, not by current truth value.

Amendment 7 touches no pin, gate, test, mutation, touch row or staged file --
a scope claim, not an inferred gate result. Implementation still staged,
still not accepted.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Ps1szk2mSfgp4Cz21eVH9x
2026-08-09 14:35:21 +02:00
..
vectors Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
ANALYSIS_GENESIS_PERSISTENCE.md The operation set absorbs genesis 2026-07-24 15:11:36 -04:00
ANALYSIS_TEXT_RUN_PRIMITIVES.md Editor T4-pre W3: the text run carries both its string and its ink 2026-07-28 14:38:06 -04:00
AUDIT_GMINOR_VOCABULARIES.md Audit the G-minor reachable vocabularies: a ledger, a matrix, one stale sentence 2026-07-28 18:27:35 -04:00
CONTRACT_CORE_DECODE_VECTORS.md The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
CONTRACT_EDITOR_T1A_GOLDENS.md Editor track: the plan, and the T1a golden-harness contract 2026-07-23 14:57:43 -04:00
CONTRACT_EDITOR_T2_SELECTION.md Editor T2: contract for selection v2, the golden gate, and copy/paste 2026-07-23 17:07:18 -04:00
CONTRACT_EDITOR_T3_CARET.md Editor T3: contract for the note-entry caret 2026-07-24 12:55:05 -04:00
CONTRACT_EDITOR_T4PRE_IR.md Editor T4-pre: the IR readiness contract, and the genesis-persistence table 2026-07-24 14:47:08 -04:00
CONTRACT_EDITOR_T4PRE_W2_GLYPHS.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
CONTRACT_EDITOR_T4_SPIKE.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
CONTRACT_FORMAT_EPOCH_MAJOR1.md Format epoch amended: pin 3c bounds the interval's conformance cost 2026-08-07 11:41:51 -04:00
CONTRACT_GENESIS_G1_INSTRUMENT.md Contract G1: one operation, and the two things that make from-empty correct 2026-07-24 18:04:30 -04:00
CONTRACT_GENESIS_G2A_SETTINGS.md Contract G2a round five: the sixth hand-maintained site, and locking Registered 2026-07-28 15:47:17 -04:00
CONTRACT_GENESIS_G2B_TUNING.md Sign t9 with a mutation that actually kills it 2026-07-29 10:18:57 -04:00
CONTRACT_GENESIS_G3A_ENTITIES.md G3a contract: ten source locators, corrected forward 2026-07-31 19:47:43 -04:00
CONTRACT_GENESIS_G3A_UNDO_REPAIR.md G3a undo repair: the tombstone branch was reachable all along 2026-07-29 18:21:45 -04:00
CONTRACT_GENESIS_G3B_MEASURE.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_GMINOR_IMPLEMENTATION.md Amend the G-minor contract: the [7f] oracle, and the PDFs the touch table missed 2026-07-28 18:59:00 -04:00
CONTRACT_GMINOR_VOCABULARY_AUDIT.md Audit contract amendments: a possible gate, and four scoping repairs 2026-07-28 18:08:55 -04:00
CONTRACT_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md P13-S6: the tuning constructions, drafted -- and why sourcing was not enough 2026-07-22 11:50:06 -04:00
CONTRACT_P13S16_PROJECTION.md P13-S16 scoped and blocked; P13-S27 filed 2026-07-31 20:27:43 -04:00
CONTRACT_P13S18_MATRIX.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_P13S19_PARTIAL.md P13-S19: what a partial measure actually costs 2026-07-31 18:13:44 -04:00
CONTRACT_P13S22_TAGLOCK.md P13-S22 contract: M2's whole-test alternative was false 2026-07-31 19:30:21 -04:00
CONTRACT_P13S27_REDUCTION_AUTHORITY.md P13-S27 amendment 7: a single source is created by deleting the others 2026-08-09 14:35:21 +02:00
CONTRACT_PUSH4B_3BII_IDENTITY.md Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym 2026-07-23 19:30:52 -04:00
CONTRACT_PUSH4B_3BI_WIRE.md Push 4b tranche 3b-i: the score wire opens schema major 3 2026-07-23 17:35:55 -04:00
CONTRACT_PUSH4B_ACCIDENTALS.md Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed 2026-07-23 13:55:19 -04:00
CONTRACT_PUSH4B_ADAPTIVE.md Push 4b: ji-adaptive-5limit resolves, and the blocker was never HarmonicContext 2026-07-24 10:17:46 -04:00
CONTRACT_PUSH4B_PITCHSPACES.md Push 4b tranche 1: contract for the pitch-space slice 2026-07-22 17:08:00 -04:00
CONTRACT_PUSH4B_RESOLVER.md Push 4b tranche 2: contract for the in-memory tuning resolver 2026-07-23 10:06:25 -04:00
CONTRACT_PUSH4B_SPEC1.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
CONTRACT_PUSH4B_TEMPERAMENTS.md Push 4b tranche 2b: contract for the ten historical temperaments 2026-07-23 11:38:14 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
HANDOFF_2026-08-07.md CLAUDE.md: the entry point an agent actually reads 2026-08-07 13:40:48 -04:00
PASS11_RATIFICATION_LOG.md P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md P13-S27 RATIFIED after nineteen review rounds; pins frozen, dispatched 2026-08-08 22:18:46 +02:00
PHASE2_F_WEEK0_WORKLIST.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PLAN_EDITOR_APP.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
PLAN_GENESIS_OPS.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
PLAN_GMINOR_SCHEMA_MINOR.md P13-S21: the two precondition reasons the wire spec never named 2026-07-30 20:57:59 -04:00
PLAN_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
QUICKSTART.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
RULING_GENESIS_PERSISTENCE.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
binary_format.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
binary_format.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
core_spec.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
core_spec.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
operation_catalog.pdf P13-S19: what a partial measure actually costs 2026-07-31 18:13:44 -04:00
operation_catalog.tex P13-S19: what a partial measure actually costs 2026-07-31 18:13:44 -04:00
quality_metric_catalog.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
text_projection.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00