epiphany/spec
Levi Neuwirth 5e465a1067 P13-S6: all twenty tuning systems now say what they mean
Ten temperaments and the static 5-limit construction were bare names in a
catalog whose own requirement calls the surrounding semantics normative.
They now carry generative rules: which fifths are tempered, by what fraction
of which comma, where the wolf sits when the construction does not force it,
exact ratios, and the closure sum that lets a reader check the whole thing
without leaving the page.

The comma distinction is the load-bearing part and no test in this repo can
see it. Pythagorean for pythagorean, werckmeister-iii and -iv, vallotti and
young-ii; syntonic for the three meantones and both Kirnberger sets, each of
which also carries the schisma-tempered F-sharp--D-flat closing fifth whose
absence made two of these temperaments arithmetically impossible in the first
draft. Verified by recomputation rather than by re-reading: 2 x 10.753 +
1.9537 and 4 x 5.377 + 1.9537 both land on 23.4600 cents exactly.

ji-adaptive-5limit gets version 1 as the key-anchored static scale, identity
"default-v1" with the version inside the machine-visible string, hard error on
anything unregistered. The anchor derivation is pinned to (7 * fifths) mod 12
off the prevailing key signature -- and pinned twice over, because
key_sequence is per-staff and time-anchored, so the staff and the moment both
had to be named or two conforming implementations would disagree on a
modulating score.

The Forward References block stops claiming KeyContext is partially defined
somewhere it is not. It is defined nowhere, stays out of scope, and now
carries the one obligation that matters: whatever completes it must expose a
tonal-centre pitch class the anchor rule can use.

Three new requirements, 209 -> 212. Verified independently of the agent that
did the work: the count by grep, the count constant by mutation, the ten
comma types against the draft, the twelve lattice ratios against a generator,
and the ten deleted lines against the four sites they were supposed to come
from.

Closes P13-S6.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-22 14:54:25 -04:00
..
vectors Text Projection: whole-document conformance, and a corpus with teeth 2026-07-21 15:44:25 -04:00
CONTRACT_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md P13-S6: the tuning constructions, drafted -- and why sourcing was not enough 2026-07-22 11:50:06 -04:00
CONTRACT_PUSH4B_SPEC1.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
PASS11_RATIFICATION_LOG.md P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md P13-S5 and P13-S6: the two inherited claims were both true 2026-07-22 09:03:39 -04:00
PHASE2_F_WEEK0_WORKLIST.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PLAN_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
QUICKSTART.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
binary_format.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
binary_format.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
core_spec.pdf P13-S6: all twenty tuning systems now say what they mean 2026-07-22 14:54:25 -04:00
core_spec.tex P13-S6: all twenty tuning systems now say what they mean 2026-07-22 14:54:25 -04:00
operation_catalog.pdf P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
operation_catalog.tex P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
quality_metric_catalog.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00