epiphany/crates
Levi Neuwirth 6651ae5fce E1 follow-up: slot-relative glyph remap (same-slot spacing preserved)
The spacing pass reserves a slot's full content extent in its advance, but
HorizontalRemap::glyphs moved every glyph independently by piecewise
interpolation — a same-slot companion whose absolute x crossed the next
slot's source was dragged by the wrong interval. E1 made it reachable: a
time signature after a morphed repeatLeft sits TIME_SIG_X + the sign's
right extension (~1.8sp) right of its barline, past the 1.6sp constrained
column step, collapsing the digits into the following note through the
real Engraver.

spacing::space_slots now returns each glyph-bearing slot's (source, target)
beside the interpolation control points; glyphs translate by their own
slot's rigid delta (intra-slot offsets survive verbatim), spanning strokes
keep endpoint interpolation, and rigid ledger strokes use the owning
glyph's slot delta exactly. Folded into ENGRAVER_VERSION 4 (unreleased this
push); scores without same-slot companions are byte-identical — only the
repeat fixture's engrave golden moved (volta digits).

Regression: time_signature_digits_ride_their_barline_slot_past_a_repeat_sign
(unbounded page so x-disjointness compares one line; verified to fail
against the interpolated remap).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-07 22:16:54 -04:00
..
epiphany-bundle Phase B follow-up: real acceleration-snapshot path + base role bound 2026-07-07 16:54:06 -04:00
epiphany-core Schema major 2 Phase D: the repeat-authoring pair (code tranche) 2026-07-07 20:06:18 -04:00
epiphany-determinism P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
epiphany-editor-core Phase D follow-up: anchor-site liveness and containment, all object kinds 2026-07-07 20:18:29 -04:00
epiphany-editor-gui Schema major 2 Phase D: the repeat-authoring pair (code tranche) 2026-07-07 20:06:18 -04:00
epiphany-engrave E1 follow-up: slot-relative glyph remap (same-slot spacing preserved) 2026-07-07 22:16:54 -04:00
epiphany-layout-ir Schema major 2 Phase E1: repeat barlines + volta brackets render 2026-07-07 21:51:11 -04:00
epiphany-ops Phase D follow-up: anchor-site liveness and containment, all object kinds 2026-07-07 20:18:29 -04:00
epiphany-render-svg E1 follow-up: slot-relative glyph remap (same-slot spacing preserved) 2026-07-07 22:16:54 -04:00
epiphany-testkit Schema major 2 Phase E1: repeat barlines + volta brackets render 2026-07-07 21:51:11 -04:00