Go to file
Levi Neuwirth 69e0430062 Push 3 Standard-tier: vertical justification (fill non-final pages)
The vertical analog of per-system justification, and the first piece of the
deferred vertical spring solve: the systems of every non-final page spread so
the last system's bottom reaches the content bottom, filling the page height.

A second pass after the top-down stacking loop, once page membership is known:
for each non-final page with >=2 systems it computes the vertical slack (the
last system's natural bottom above the content bottom) and distributes it evenly
across the inter-system gaps — system i (0-based on the page) sinks by i/(n-1) of
the slack, so the first stays at the content top and the last lands on the
content bottom. Only Placement::dy changes, so it composes cleanly with
horizontal justification (independent axes). ENGRAVER_VERSION 8 -> 9.

The last page stays ragged-bottom (top-aligned, engraving convention), so a
single-page score is unchanged — every existing single-page golden is
byte-identical (zero golden churn). A single-system or already-full page has no
slack. Drives page_fill_efficiency to ~0 on justified pages.

Regression: vertical_justification_fills_non_final_pages (a small custom
PageGeometry forces the multi-page path; the non-final page fills, the last
stays ragged; verified to fail without the pass). Inter-staff band-height
renegotiation within a multi-staff system remains the deferred rest of the
vertical spring solve. 942 tests, clippy 0, docs -D warnings, conformance 8/8.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-08 20:36:18 -04:00
.github/workflows Push 4: Binary Format companion, F1 benches, subquadratic reduction order 2026-07-02 19:02:07 -04:00
crates Push 3 Standard-tier: vertical justification (fill non-final pages) 2026-07-08 20:36:18 -04:00
spec Pass 13 — P13-D2: tombstone before the graph delete, closing the cue-cascade trail 2026-07-08 18:25:37 -04:00
.gitignore Schema major 1 Phase F: ratify engrave I8/I9/I10 + process trail 2026-07-06 17:40:38 -04:00
CONFORMANCE.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
Cargo.lock Phase 3 tranche 2: quality conformance companions, real metrics, multi-system click fix 2026-07-03 10:39:05 -04:00
Cargo.toml Push 4: Binary Format companion, F1 benches, subquadratic reduction order 2026-07-02 19:02:07 -04:00