Go to file
Levi Neuwirth 7045a13a18 Schema major 1 Phase F: ratify engrave I8/I9/I10 + process trail
Spec/process only, no code. Closes the schema-major-1 track (Phases A-F): the
two data-model batch rows parked behind the frozen-layout rule (P12-I7, P12-K7)
landed via Phases C/D1, and the three engrave/layout-ir dispositions the
implementation already made are ratified into the core spec.

- core_spec: three normative requirements ratifying the implemented behavior --
  break-constraint satisfaction (req:layoutir:break-satisfaction, I8: a
  SystemBreakAt/PageBreakAt is satisfied iff the final ResolvedLayoutIR starts a
  system/page at that slot), break-override attribution via a
  ConstrainedLayoutIR.break_origins sidecar declining to widen the constraint
  record (req:layoutir:break-origin-attribution, I9), and system-continuation
  synthesis Registered(SYSTEM_CONTINUATION_SYNTHESIS) with an (original, ordinal)
  instance key (req:layoutir:continuation-synthesis, I10). Revision-history row.
  PDF rebuilt (latexmk -xelatex, 0 undefined refs).
- PASS12_RATIFICATION_LOG: schema-major-1 tranche (I7/K7 landed + I8/I9/I10
  adopt), with the open cross-region-slur item flagged.
- PASS12_BATCH: struck I7/K7/I8/I9/I10; added P12-K12 (which region governs a
  cross-region slur's spanning permission -- implemented as conservative AND).
- engrave/layout-ir DECISIONS: ratification cross-refs; the P12-I7 note reworded
  so deferred Phase C' does not read as landed.
- .gitignore: spec/*.xdv (xelatex intermediate; the tracked PDF is committed).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01NEs4aYiu8MXjdYdMxw8PTd
2026-07-06 17:40:38 -04:00
.github/workflows Push 4: Binary Format companion, F1 benches, subquadratic reduction order 2026-07-02 19:02:07 -04:00
crates Schema major 1 Phase F: ratify engrave I8/I9/I10 + process trail 2026-07-06 17:40:38 -04:00
spec Schema major 1 Phase F: ratify engrave I8/I9/I10 + process trail 2026-07-06 17:40:38 -04:00
.gitignore Schema major 1 Phase F: ratify engrave I8/I9/I10 + process trail 2026-07-06 17:40:38 -04:00
CONFORMANCE.md Pushes 1+3: fix the MUST-level violations, wire the types-only machinery 2026-07-02 17:10:50 -04:00
Cargo.lock Phase 3 tranche 2: quality conformance companions, real metrics, multi-system click fix 2026-07-03 10:39:05 -04:00
Cargo.toml Push 4: Binary Format companion, F1 benches, subquadratic reduction order 2026-07-02 19:02:07 -04:00