epiphany/spec
Levi Neuwirth 7c8a30d282
P13-S26 amendment 3 RATIFIED; test 3 to be clause-scoped
Execution measured that pin 4a claims more than test 3 delivers. M12's first
application deleted the ordering referent from the requirement's normative
clause and left it standing in the closing recap; test 3 stayed green, because
it asserts phrase presence over the whole requirement block. A referent can
therefore leave the sentence where it does normative work and survive anywhere
else in the block.

Two repairs were available. Softening pin 4a to promise only what block-scoped
presence delivers would have made the contract honest and the guard no better,
leaving a measured escape undetected in a rung whose subject is documentation
drifting because nothing watches it. This amendment strengthens the guard
instead, so pin 4a's claim becomes true rather than smaller.

Test 3 will select the normative clause -- the sentence carrying the sole
\MUST{} -- and run all four assertions on that slice alone. The selector took
four rounds to get right and both halves of its start rule are load-bearing:
last ". " before the occurrence, falling back after the label only when there is
none. Revision B made the fallback unconditional, which would have handed M25 a
slice spanning label to recap containing every needle; revision C restored the
rule the fallback exists for.

Six signing mutations, one per step of the selector: M22 and M23 the referents'
clause scope, M24 the locality phrase, M25 the last-period rule, M26 the
fallback anchor, M27 the exactly-one-\MUST{} assertion. M27 closes the last open
item -- an assertion specified without asking what would exercise it -- and it is
the only mutation that varies which clause is chosen rather than what the clause
contains. Each carries a complete before/after requirement block so it applies
literally.

The section is an additive override: pin 4a and section 3 are frozen and are not
rewritten, the mutations are section 8's rather than inserted into section 3's
table, and the annex's 38/38 matrix is preserved with M22-M27 evidence appended.
Execution touches rows 4, 6, 7 and 8 only; core_spec.tex is not touched, because
the requirement's text was always correct and only the guard was weak.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Ps1szk2mSfgp4Cz21eVH9x
2026-08-11 20:14:27 +02:00
..
vectors Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
ANALYSIS_GENESIS_PERSISTENCE.md The operation set absorbs genesis 2026-07-24 15:11:36 -04:00
ANALYSIS_TEXT_RUN_PRIMITIVES.md Editor T4-pre W3: the text run carries both its string and its ink 2026-07-28 14:38:06 -04:00
AUDIT_GMINOR_VOCABULARIES.md Audit the G-minor reachable vocabularies: a ledger, a matrix, one stale sentence 2026-07-28 18:27:35 -04:00
CONTRACT_CORE_DECODE_VECTORS.md The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
CONTRACT_EDITOR_T1A_GOLDENS.md Editor track: the plan, and the T1a golden-harness contract 2026-07-23 14:57:43 -04:00
CONTRACT_EDITOR_T2_SELECTION.md Editor T2: contract for selection v2, the golden gate, and copy/paste 2026-07-23 17:07:18 -04:00
CONTRACT_EDITOR_T3_CARET.md Editor T3: contract for the note-entry caret 2026-07-24 12:55:05 -04:00
CONTRACT_EDITOR_T4PRE_IR.md Editor T4-pre: the IR readiness contract, and the genesis-persistence table 2026-07-24 14:47:08 -04:00
CONTRACT_EDITOR_T4PRE_W2_GLYPHS.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
CONTRACT_EDITOR_T4_SPIKE.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
CONTRACT_FORMAT_EPOCH_MAJOR1.md Format epoch amended: pin 3c bounds the interval's conformance cost 2026-08-07 11:41:51 -04:00
CONTRACT_GENESIS_G1_INSTRUMENT.md Contract G1: one operation, and the two things that make from-empty correct 2026-07-24 18:04:30 -04:00
CONTRACT_GENESIS_G2A_SETTINGS.md Contract G2a round five: the sixth hand-maintained site, and locking Registered 2026-07-28 15:47:17 -04:00
CONTRACT_GENESIS_G2B_TUNING.md Sign t9 with a mutation that actually kills it 2026-07-29 10:18:57 -04:00
CONTRACT_GENESIS_G3A_ENTITIES.md G3a contract: ten source locators, corrected forward 2026-07-31 19:47:43 -04:00
CONTRACT_GENESIS_G3A_UNDO_REPAIR.md G3a undo repair: the tombstone branch was reachable all along 2026-07-29 18:21:45 -04:00
CONTRACT_GENESIS_G3B_MEASURE.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_GMINOR_IMPLEMENTATION.md Amend the G-minor contract: the [7f] oracle, and the PDFs the touch table missed 2026-07-28 18:59:00 -04:00
CONTRACT_GMINOR_VOCABULARY_AUDIT.md Audit contract amendments: a possible gate, and four scoping repairs 2026-07-28 18:08:55 -04:00
CONTRACT_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md P13-S6: the tuning constructions, drafted -- and why sourcing was not enough 2026-07-22 11:50:06 -04:00
CONTRACT_P13S16_PROJECTION.md P13-S16 amendment 1, review round 1: two documents still described the old state 2026-08-10 17:50:42 +02:00
CONTRACT_P13S18_MATRIX.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_P13S19_PARTIAL.md P13-S19: what a partial measure actually costs 2026-07-31 18:13:44 -04:00
CONTRACT_P13S22_TAGLOCK.md P13-S22 contract: M2's whole-test alternative was false 2026-07-31 19:30:21 -04:00
CONTRACT_P13S26_INVARIANT10_SURFACE.md P13-S26 amendment 3 RATIFIED; test 3 to be clause-scoped 2026-08-11 20:14:27 +02:00
CONTRACT_P13S27_REDUCTION_AUTHORITY.md P13-S27: accept reduction authority implementation 2026-08-09 15:05:58 +02:00
CONTRACT_PUSH4B_3BII_IDENTITY.md Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym 2026-07-23 19:30:52 -04:00
CONTRACT_PUSH4B_3BI_WIRE.md Push 4b tranche 3b-i: the score wire opens schema major 3 2026-07-23 17:35:55 -04:00
CONTRACT_PUSH4B_ACCIDENTALS.md Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed 2026-07-23 13:55:19 -04:00
CONTRACT_PUSH4B_ADAPTIVE.md Push 4b: ji-adaptive-5limit resolves, and the blocker was never HarmonicContext 2026-07-24 10:17:46 -04:00
CONTRACT_PUSH4B_PITCHSPACES.md Push 4b tranche 1: contract for the pitch-space slice 2026-07-22 17:08:00 -04:00
CONTRACT_PUSH4B_RESOLVER.md Push 4b tranche 2: contract for the in-memory tuning resolver 2026-07-23 10:06:25 -04:00
CONTRACT_PUSH4B_SPEC1.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
CONTRACT_PUSH4B_TEMPERAMENTS.md Push 4b tranche 2b: contract for the ten historical temperaments 2026-07-23 11:38:14 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
EVIDENCE_P13S16_EXECUTION.md P13-S16 amendment 1, review round 1: two documents still described the old state 2026-08-10 17:50:42 +02:00
EVIDENCE_P13S26_EXECUTION.md P13-S26 EXECUTED: invariant 10 names its derived reference surface 2026-08-11 18:11:25 +02:00
HANDOFF_2026-08-07.md P13-S26 post-acceptance reconciliation: the two documents held back 2026-08-11 19:31:35 +02:00
PASS11_RATIFICATION_LOG.md P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md P13-S26 EXECUTED: invariant 10 names its derived reference surface 2026-08-11 18:11:25 +02:00
PHASE2_F_WEEK0_WORKLIST.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PLAN_EDITOR_APP.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
PLAN_GENESIS_OPS.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
PLAN_GMINOR_SCHEMA_MINOR.md P13-S21: the two precondition reasons the wire spec never named 2026-07-30 20:57:59 -04:00
PLAN_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
QUICKSTART.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
RULING_GENESIS_PERSISTENCE.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
binary_format.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
binary_format.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
core_spec.pdf P13-S26 EXECUTED: invariant 10 names its derived reference surface 2026-08-11 18:11:25 +02:00
core_spec.tex P13-S26 EXECUTED: invariant 10 names its derived reference surface 2026-08-11 18:11:25 +02:00
operation_catalog.pdf P13-S16 EXECUTED: StaffGroup.members becomes a maintained projection 2026-08-10 17:18:20 +02:00
operation_catalog.tex P13-S16 EXECUTED: StaffGroup.members becomes a maintained projection 2026-08-10 17:18:20 +02:00
quality_metric_catalog.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
text_projection.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00