S16 draft amendment 1 rev E: a gate must name evidence its artifact produces
Independent review of cae1d32 returned two blocking findings and one stale
rationale. Both blocking findings are in requirements revision D itself wrote,
and both are revision D's own closing lesson turned back on it.

1. Row 8's new generator test had no name, so nothing consumed it. Gate 6
   named only m41 and m41b; §6 item 2d asks for shrink evidence. Omitting the
   test entirely would still compile, satisfy all four all() loops, and pass
   every named gate.

   Named invariant_21_negative_generator_breaks_staff_to_group_only, with its
   three assertions spelled out: exactly one violation and it is
   StaffGroupMembershipAgreement, the witness naming the S->G ids, and the
   G->S direction asserted satisfied. Added to gate 6 and to new §6 item 2e.

   This is revision D's own lesson unapplied to itself: it closed by
   distinguishing a rule with no consumer from a rule with no observer, then
   wrote a requirement with neither. An unnamed artifact cannot be gated,
   because every gate here names what it checks.

2. Gate 6 demanded runtime evidence the prescribed tests cannot emit. It said
   to quote check_invariants' full return and witness ids, but these are
   assert!-style tests in m40's shape and cargo test prints ok, not local
   values. Obeying it literally would need unpinned --nocapture
   instrumentation added purely to produce a report, or source inference
   presented as observation.

   Evidence model now chosen explicitly: quote the SOURCE assertions plus the
   pass verdict. A passing exact-set assertion IS the observation -- the
   assertion text says what was checked, the verdict says it held. This
   follows S27's gate 6c, which quotes a struct definition rather than
   grepping for it: a quoted source construct is read, not inferred. It also
   adds no code to epiphany-core written solely for a report.

   The requirement was right and the mechanism was borrowed from gates that
   run commands and read stdout. A gate must name evidence the prescribed
   artifact actually produces; otherwise execution improvises, and improvised
   instrumentation is unpinned scope arriving through the report.

3. Gate 4's rationale still said row 11 is "conditional," which revision D
   changed to decided-unused. A fourth site under pin 10a said "carrying it
   conditionally costs nothing" -- found by sweep. Both updated. The subset
   rule itself is unaffected; only its rationale needed the current term.

Still DRAFT, still unratified. No implementation work has begun.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Ps1szk2mSfgp4Cz21eVH9x
2026-08-09 17:42:22 +02:00
..
vectors Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
ANALYSIS_GENESIS_PERSISTENCE.md The operation set absorbs genesis 2026-07-24 15:11:36 -04:00
ANALYSIS_TEXT_RUN_PRIMITIVES.md Editor T4-pre W3: the text run carries both its string and its ink 2026-07-28 14:38:06 -04:00
AUDIT_GMINOR_VOCABULARIES.md Audit the G-minor reachable vocabularies: a ledger, a matrix, one stale sentence 2026-07-28 18:27:35 -04:00
CONTRACT_CORE_DECODE_VECTORS.md The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
CONTRACT_EDITOR_T1A_GOLDENS.md Editor track: the plan, and the T1a golden-harness contract 2026-07-23 14:57:43 -04:00
CONTRACT_EDITOR_T2_SELECTION.md Editor T2: contract for selection v2, the golden gate, and copy/paste 2026-07-23 17:07:18 -04:00
CONTRACT_EDITOR_T3_CARET.md Editor T3: contract for the note-entry caret 2026-07-24 12:55:05 -04:00
CONTRACT_EDITOR_T4PRE_IR.md Editor T4-pre: the IR readiness contract, and the genesis-persistence table 2026-07-24 14:47:08 -04:00
CONTRACT_EDITOR_T4PRE_W2_GLYPHS.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
CONTRACT_EDITOR_T4_SPIKE.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
CONTRACT_FORMAT_EPOCH_MAJOR1.md Format epoch amended: pin 3c bounds the interval's conformance cost 2026-08-07 11:41:51 -04:00
CONTRACT_GENESIS_G1_INSTRUMENT.md Contract G1: one operation, and the two things that make from-empty correct 2026-07-24 18:04:30 -04:00
CONTRACT_GENESIS_G2A_SETTINGS.md Contract G2a round five: the sixth hand-maintained site, and locking Registered 2026-07-28 15:47:17 -04:00
CONTRACT_GENESIS_G2B_TUNING.md Sign t9 with a mutation that actually kills it 2026-07-29 10:18:57 -04:00
CONTRACT_GENESIS_G3A_ENTITIES.md G3a contract: ten source locators, corrected forward 2026-07-31 19:47:43 -04:00
CONTRACT_GENESIS_G3A_UNDO_REPAIR.md G3a undo repair: the tombstone branch was reachable all along 2026-07-29 18:21:45 -04:00
CONTRACT_GENESIS_G3B_MEASURE.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_GMINOR_IMPLEMENTATION.md Amend the G-minor contract: the [7f] oracle, and the PDFs the touch table missed 2026-07-28 18:59:00 -04:00
CONTRACT_GMINOR_VOCABULARY_AUDIT.md Audit contract amendments: a possible gate, and four scoping repairs 2026-07-28 18:08:55 -04:00
CONTRACT_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md P13-S6: the tuning constructions, drafted -- and why sourcing was not enough 2026-07-22 11:50:06 -04:00
CONTRACT_P13S16_PROJECTION.md S16 draft amendment 1 rev E: a gate must name evidence its artifact produces 2026-08-09 17:42:22 +02:00
CONTRACT_P13S18_MATRIX.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_P13S19_PARTIAL.md P13-S19: what a partial measure actually costs 2026-07-31 18:13:44 -04:00
CONTRACT_P13S22_TAGLOCK.md P13-S22 contract: M2's whole-test alternative was false 2026-07-31 19:30:21 -04:00
CONTRACT_P13S27_REDUCTION_AUTHORITY.md P13-S27: accept reduction authority implementation 2026-08-09 15:05:58 +02:00
CONTRACT_PUSH4B_3BII_IDENTITY.md Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym 2026-07-23 19:30:52 -04:00
CONTRACT_PUSH4B_3BI_WIRE.md Push 4b tranche 3b-i: the score wire opens schema major 3 2026-07-23 17:35:55 -04:00
CONTRACT_PUSH4B_ACCIDENTALS.md Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed 2026-07-23 13:55:19 -04:00
CONTRACT_PUSH4B_ADAPTIVE.md Push 4b: ji-adaptive-5limit resolves, and the blocker was never HarmonicContext 2026-07-24 10:17:46 -04:00
CONTRACT_PUSH4B_PITCHSPACES.md Push 4b tranche 1: contract for the pitch-space slice 2026-07-22 17:08:00 -04:00
CONTRACT_PUSH4B_RESOLVER.md Push 4b tranche 2: contract for the in-memory tuning resolver 2026-07-23 10:06:25 -04:00
CONTRACT_PUSH4B_SPEC1.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
CONTRACT_PUSH4B_TEMPERAMENTS.md Push 4b tranche 2b: contract for the ten historical temperaments 2026-07-23 11:38:14 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
HANDOFF_2026-08-07.md Handoff: make the POST-S27 block genuinely the sole source 2026-08-09 15:43:09 +02:00
PASS11_RATIFICATION_LOG.md
PASS11_WORKLIST.md
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md Post-S27 doc reconciliation: CLAUDE, handoff, S16 contract, both ledger cells 2026-08-09 15:24:21 +02:00
PHASE2_F_WEEK0_WORKLIST.md
PHASE2_QUICKSTART.md
PLAN_EDITOR_APP.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
PLAN_GENESIS_OPS.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
PLAN_GMINOR_SCHEMA_MINOR.md P13-S21: the two precondition reasons the wire spec never named 2026-07-30 20:57:59 -04:00
PLAN_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
QUICKSTART.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
RULING_GENESIS_PERSISTENCE.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
binary_format.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
binary_format.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
core_spec.pdf P13-S27: accept reduction authority implementation 2026-08-09 15:05:58 +02:00
core_spec.tex P13-S27: accept reduction authority implementation 2026-08-09 15:05:58 +02:00
operation_catalog.pdf P13-S19: what a partial measure actually costs 2026-07-31 18:13:44 -04:00
operation_catalog.tex P13-S19: what a partial measure actually costs 2026-07-31 18:13:44 -04:00
quality_metric_catalog.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
text_projection.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00