..
vectors
Container major 1: the format epoch carries base provenance
2026-08-07 12:51:14 -04:00
ANALYSIS_GENESIS_PERSISTENCE.md
The operation set absorbs genesis
2026-07-24 15:11:36 -04:00
ANALYSIS_TEXT_RUN_PRIMITIVES.md
Editor T4-pre W3: the text run carries both its string and its ink
2026-07-28 14:38:06 -04:00
AUDIT_GMINOR_VOCABULARIES.md
Audit the G-minor reachable vocabularies: a ledger, a matrix, one stale sentence
2026-07-28 18:27:35 -04:00
CONTRACT_CORE_DECODE_VECTORS.md
The decode vector corpus reaches the core score wire
2026-07-24 11:38:15 -04:00
CONTRACT_EDITOR_T1A_GOLDENS.md
Editor track: the plan, and the T1a golden-harness contract
2026-07-23 14:57:43 -04:00
CONTRACT_EDITOR_T2_SELECTION.md
Editor T2: contract for selection v2, the golden gate, and copy/paste
2026-07-23 17:07:18 -04:00
CONTRACT_EDITOR_T3_CARET.md
Editor T3: contract for the note-entry caret
2026-07-24 12:55:05 -04:00
CONTRACT_EDITOR_T4PRE_IR.md
Editor T4-pre: the IR readiness contract, and the genesis-persistence table
2026-07-24 14:47:08 -04:00
CONTRACT_EDITOR_T4PRE_W2_GLYPHS.md
Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer
2026-07-24 17:50:02 -04:00
CONTRACT_EDITOR_T4_SPIKE.md
Contract revision 6: round 1 was testing the wrong property on the wrong glyphs
2026-07-28 21:24:47 -04:00
CONTRACT_FORMAT_EPOCH_MAJOR1.md
Format epoch amended: pin 3c bounds the interval's conformance cost
2026-08-07 11:41:51 -04:00
CONTRACT_GENESIS_G1_INSTRUMENT.md
Contract G1: one operation, and the two things that make from-empty correct
2026-07-24 18:04:30 -04:00
CONTRACT_GENESIS_G2A_SETTINGS.md
Contract G2a round five: the sixth hand-maintained site, and locking Registered
2026-07-28 15:47:17 -04:00
CONTRACT_GENESIS_G2B_TUNING.md
Sign t9 with a mutation that actually kills it
2026-07-29 10:18:57 -04:00
CONTRACT_GENESIS_G3A_ENTITIES.md
G3a contract: ten source locators, corrected forward
2026-07-31 19:47:43 -04:00
CONTRACT_GENESIS_G3A_UNDO_REPAIR.md
G3a undo repair: the tombstone branch was reachable all along
2026-07-29 18:21:45 -04:00
CONTRACT_GENESIS_G3B_MEASURE.md
P13-S18: the invariant-20 outcome matrix, and what the residue actually is
2026-07-31 17:05:49 -04:00
CONTRACT_GMINOR_IMPLEMENTATION.md
Amend the G-minor contract: the [7f] oracle, and the PDFs the touch table missed
2026-07-28 18:59:00 -04:00
CONTRACT_GMINOR_VOCABULARY_AUDIT.md
Audit contract amendments: a possible gate, and four scoping repairs
2026-07-28 18:08:55 -04:00
CONTRACT_P13S1_LABELS.md
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md
P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic
2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md
P13-S6: the tuning constructions, drafted -- and why sourcing was not enough
2026-07-22 11:50:06 -04:00
CONTRACT_P13S16_PROJECTION.md
Post-S27 docs: scope the supersessions properly in handoff and S16 contract
2026-08-09 15:39:50 +02:00
CONTRACT_P13S18_MATRIX.md
P13-S18: the invariant-20 outcome matrix, and what the residue actually is
2026-07-31 17:05:49 -04:00
CONTRACT_P13S19_PARTIAL.md
P13-S19: what a partial measure actually costs
2026-07-31 18:13:44 -04:00
CONTRACT_P13S22_TAGLOCK.md
P13-S22 contract: M2's whole-test alternative was false
2026-07-31 19:30:21 -04:00
CONTRACT_P13S27_REDUCTION_AUTHORITY.md
P13-S27: accept reduction authority implementation
2026-08-09 15:05:58 +02:00
CONTRACT_PUSH4B_3BII_IDENTITY.md
Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym
2026-07-23 19:30:52 -04:00
CONTRACT_PUSH4B_3BI_WIRE.md
Push 4b tranche 3b-i: the score wire opens schema major 3
2026-07-23 17:35:55 -04:00
CONTRACT_PUSH4B_ACCIDENTALS.md
Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed
2026-07-23 13:55:19 -04:00
CONTRACT_PUSH4B_ADAPTIVE.md
Push 4b: ji-adaptive-5limit resolves, and the blocker was never HarmonicContext
2026-07-24 10:17:46 -04:00
CONTRACT_PUSH4B_PITCHSPACES.md
Push 4b tranche 1: contract for the pitch-space slice
2026-07-22 17:08:00 -04:00
CONTRACT_PUSH4B_RESOLVER.md
Push 4b tranche 2: contract for the in-memory tuning resolver
2026-07-23 10:06:25 -04:00
CONTRACT_PUSH4B_SPEC1.md
Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way
2026-07-22 11:49:40 -04:00
CONTRACT_PUSH4B_TEMPERAMENTS.md
Push 4b tranche 2b: contract for the ten historical temperaments
2026-07-23 11:38:14 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md
Text Projection: the document layer, and the equation closes
2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md
Text Projection: the operation layer, and the tests that can see it fail
2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md
P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic
2026-07-22 14:26:08 -04:00
HANDOFF_2026-08-07.md
Handoff: make the POST-S27 block genuinely the sole source
2026-08-09 15:43:09 +02:00
PASS11_RATIFICATION_LOG.md
P12-I2: wire the ratified MUSCLOID layout-object id derivation
2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md
Pass 11: ratify provisional byte choices into normative spec text
2026-06-21 22:30:06 -04:00
PASS12_BATCH.md
Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche
2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md
Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche
2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md
Post-S27 doc reconciliation: CLAUDE, handoff, S16 contract, both ledger cells
2026-08-09 15:24:21 +02:00
PHASE2_F_WEEK0_WORKLIST.md
Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate
2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md
Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate
2026-06-23 16:33:39 -04:00
PLAN_EDITOR_APP.md
Contract revision 6: round 1 was testing the wrong property on the wrong glyphs
2026-07-28 21:24:47 -04:00
PLAN_GENESIS_OPS.md
G3b packet 3b: the documentation half, and the ladder closes
2026-07-30 20:45:27 -04:00
PLAN_GMINOR_SCHEMA_MINOR.md
P13-S21: the two precondition reasons the wire spec never named
2026-07-30 20:57:59 -04:00
PLAN_P13S1_LABELS.md
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md
P13-S2: the alteration is space-relative, and the core fails closed
2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md
Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way
2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md
Text Projection: the document layer, and the equation closes
2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md
Text Projection: the operation layer, and the tests that can see it fail
2026-07-21 13:43:09 -04:00
QUICKSTART.md
G3b packet 3b: the documentation half, and the ladder closes
2026-07-30 20:45:27 -04:00
RULING_GENESIS_PERSISTENCE.md
Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer
2026-07-24 17:50:02 -04:00
binary_format.pdf
Container major 1: the format epoch carries base provenance
2026-08-07 12:51:14 -04:00
binary_format.tex
Container major 1: the format epoch carries base provenance
2026-08-07 12:51:14 -04:00
core_spec.pdf
P13-S27: accept reduction authority implementation
2026-08-09 15:05:58 +02:00
core_spec.tex
P13-S27: accept reduction authority implementation
2026-08-09 15:05:58 +02:00
operation_catalog.pdf
P13-S19: what a partial measure actually costs
2026-07-31 18:13:44 -04:00
operation_catalog.tex
P13-S19: what a partial measure actually costs
2026-07-31 18:13:44 -04:00
quality_metric_catalog.pdf
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
reference_suite.pdf
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
reference_suite.tex
P13-S1: every requirement is named, and now it is also numbered
2026-07-21 18:27:52 -04:00
text_projection.pdf
Container major 1: the format epoch carries base provenance
2026-08-07 12:51:14 -04:00
text_projection.tex
Container major 1: the format epoch carries base provenance
2026-08-07 12:51:14 -04:00