epiphany/spec
Levi Neuwirth aff1809421 Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche
The G-ratification pass over the accumulated PASS12_BATCH backlog
(worklist: spec/PASS12_WORKLIST.md; dispositions:
PASS12_RATIFICATION_LOG "G-pass tranche"). Four project-lead
decisions: K12 slur permission = AND, H7 authored-uninferred
annotations SURFACE, K4 ResolveConflict = no supersede, K8 genesis
outside the operation set. Three named deferrals: H2 (narrowed;
spelling-v2 + notation refinement), K2 (tuning catalog), K5 (Profile
Conformance companion).

core_spec: spelling + decomposition move to profile-declared with
ratified v1 defaults (req:pitch:spelling-algorithm,
req:time:decomposition-algorithm — two open-question boxes closed);
authored-uninferred surfacing (req:pitch:authored-uninferred);
decomposition precedence pinned FIXED; system-derived content
immutability (K3); genesis note (K8); slur AND advisory (K12);
re-anchoring table C1/C2/C3 + SameCanvasNearer variant (C4); barrier
matching + unsafe-tombstone semantics (req:format:barrier-matching,
req:format:unsafe-tombstone); solver kind-strength /
sub-conformant-report / Minimal-floor requirements (I4/I5/I6); stale
OperationKindTag listing gains the eleven appended tags.

operation_catalog 0.5.0 -> 0.6.0: K1 migration fallback long-term;
K4 no-supersede; K6 edge semantics (single-pass, quarantine excluded,
pending governs); K5 deferral pinned; K8 slots RETIRED; K10 reuse
blessed; K11 asymmetry normative; K12 AND; K2 prototype pin;
K3/K9 preconditions.

binary_format 0.3.0 -> 0.4.0: appended vocab discriminants
SystemDerivedContentImmutable(12), RecreateContentMismatch(13),
SameCanvasNearer(6); E5 tombstone-encoding open question.

All three PDFs rebuilt clean, zero undefined references. Batch rows
struck 28 -> 0 (tracker CLOSED); CONFORMANCE.md caveat dropped;
DECISIONS cross-refs in core/ops/layout-ir/editor-core (new file).

Code tranche (H7 surfacing, K3/K9/C4 discriminants) follows.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01NEs4aYiu8MXjdYdMxw8PTd
2026-07-07 10:23:30 -04:00
..
PASS11_RATIFICATION_LOG.md P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PHASE2_F_WEEK0_WORKLIST.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
PHASE2_QUICKSTART.md Phase 2: spelling + decomposition pre-passes (Agent H) with F merge gate 2026-06-23 16:33:39 -04:00
QUICKSTART.md Pass 11: ratify provisional byte choices into normative spec text 2026-06-21 22:30:06 -04:00
binary_format.pdf Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
binary_format.tex Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
core_spec.pdf Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
core_spec.tex Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
operation_catalog.pdf Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
operation_catalog.tex Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
quality_metric_catalog.pdf Schema major 1 Phase A: ratify the v1 wire form + migration (spec only) 2026-07-05 18:05:38 -04:00
quality_metric_catalog.tex Schema major 1 Phase A: ratify the v1 wire form + migration (spec only) 2026-07-05 18:05:38 -04:00
reference_suite.pdf Schema major 1 Phase A: ratify the v1 wire form + migration (spec only) 2026-07-05 18:05:38 -04:00
reference_suite.tex Schema major 1 Phase A: ratify the v1 wire form + migration (spec only) 2026-07-05 18:05:38 -04:00