Levi Neuwirth be40eb2d7d Contract G2a: the split, and the two setters that move no wire bound
G2 was scoped as one packet of three LWW setters. Reading the frozen codec
walks rather than the type labels shows they do not sit at the same major:
SpellingPrecedence has never been versioned, CanvasLayoutDefaults is versioned
in the containing Canvas walk and not the leaf, and only ScoreTuningContext is
born at v3. So the accept-set raise — a one-way door — is charged to one
surface, not amortised across nine as the ruling's framing implied. G2 splits:
G2a is the two major-0 setters and touches epiphany-bundle not at all; G2b is
SetTuningContext alone, carrying the raise and the S13 close.

Withdraws plan trap 5. SetMetadata already answers it: Score::empty seeds
metadata exactly as it seeds tuning_context, the base ingest seeds the LWW
chain from it, and restoring that seed is correct for both never-authored and
authored-to-default. These are always-valued fields, not map keys, so the
Predecessor::Base/::Write distinction that matters for spellings and breaks
does not apply here.

Records the G1 lesson as a trap in its own right: an OperationKind variant is
not containable to core+ops, and the G2a contract budgets all three downstream
literal sites up front instead of discovering them mid-dispatch.

Corrects S13's amortisation claim, and states the closure argument properly —
the canonical base is a MaterializedState that embeds no graph values for any
field, so S13 closes on the metadata precedent, not on the base. Notes the
consequence: after G2b, pruning would discard authored state.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01QjsEnYhm1gPpf6ii2iFxFV
2026-07-28 14:18:49 -04:00
.github/workflows Editor T2 W3: the goldens become conformance gate [9/9] 2026-07-23 17:20:14 -04:00
crates Genesis G1: CreateInstrument, and the from-empty spine reaches a note 2026-07-24 21:02:12 -04:00
spec Contract G2a: the split, and the two setters that move no wire bound 2026-07-28 14:18:49 -04:00
.gitignore Schema major 1 Phase F: ratify engrave I8/I9/I10 + process trail 2026-07-06 17:40:38 -04:00
CONFORMANCE.md Editor T2 W3: the goldens become conformance gate [9/9] 2026-07-23 17:20:14 -04:00
Cargo.lock Editor T4-pre W2: the glyph outlines become a shared typed seam 2026-07-24 18:54:30 -04:00
Cargo.toml Editor T4-pre W2: the glyph outlines become a shared typed seam 2026-07-24 18:54:30 -04:00