epiphany/spec
Levi Neuwirth cea21cd8f9
P13-S29 RATIFIED; pins frozen, dispatched
Graph invariant 10 reported Chapter 3 and Chapter 4 failures under its own
number, through a public API: check_invariant is pub and re-exported, and
Display rendered a tempo rule as "invariant 10 (CrossCuttingRefsResolve)
violated". Disposition (b), type-neutral: InvariantViolation becomes
WellFormednessViolation carrying a two-armed ViolationKind. check_invariants
stays comprehensive, so every broad caller keeps its rule coverage; the
deliberate behaviour change is that check_invariant narrows to the invariant
arm, with a symmetric check_requirement added. GraphInvariant does not move --
21 variants, unchanged, and no new negative generator or shrink obligation.

req:time:tempo-segment-shape is minted for the one rider that had no label,
stating the enforced shape/end_tempo compatibility without resolving P13-S8's
canonical-form question, so the label survives whichever spelling S8 ratifies.

Eighteen review rounds. Four mutation radii were measured against disposable
implementations rather than derived, and every one of the four differed from
what static reading predicted: M2a by ten false positives and seventeen
omissions, M17-C1 by naming seven where eighteen fail and including a test that
belongs to C2, M17-C2 and C3 by predicting observers that measurement put at one
and zero. Two of those measurements first produced a compile error reporting
zero failures -- a compile error observes nothing -- and one misread cargo test's
"error: test failed" as a compilation signal; only the third method is pinned.

Several defects were structural rather than arithmetic. Both selectors could
have matched their arm while ignoring their payload, satisfied by every fixture
presenting a single variant or label. A complete third ViolationKind arm, or a
fully implemented 22nd GraphInvariant omitted from all(), compiles and leaves
every gate green -- a variant nothing enumerates is a variant nothing observes.
The accidental tests identified their rule by a witness suffix this rung
deletes, so a selector-only migration would have left two negatives green and
vacuous. And invariants.rs:8 carries the old type name in retained header prose,
which would have made gate 6 unsatisfiable.

Prerequisite review scaffolding, applied earlier under a narrow authorization
and committed here because ratification is what changes its staging state: one
temporary DISCUSSED_NOT_CITED row for req:time:tempo-segment-shape, deleted by
pin 3 when the requirement lands, with landing gates for its absence and for the
baseline being green because the label is defined rather than still allowlisted.

Baseline unchanged at 43 suites, 1586 passing; no implementation target has been
modified.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Ps1szk2mSfgp4Cz21eVH9x
2026-08-12 00:05:32 +02:00
..
vectors Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
ANALYSIS_GENESIS_PERSISTENCE.md The operation set absorbs genesis 2026-07-24 15:11:36 -04:00
ANALYSIS_TEXT_RUN_PRIMITIVES.md Editor T4-pre W3: the text run carries both its string and its ink 2026-07-28 14:38:06 -04:00
AUDIT_GMINOR_VOCABULARIES.md Audit the G-minor reachable vocabularies: a ledger, a matrix, one stale sentence 2026-07-28 18:27:35 -04:00
CONTRACT_CORE_DECODE_VECTORS.md The decode vector corpus reaches the core score wire 2026-07-24 11:38:15 -04:00
CONTRACT_EDITOR_T1A_GOLDENS.md Editor track: the plan, and the T1a golden-harness contract 2026-07-23 14:57:43 -04:00
CONTRACT_EDITOR_T2_SELECTION.md Editor T2: contract for selection v2, the golden gate, and copy/paste 2026-07-23 17:07:18 -04:00
CONTRACT_EDITOR_T3_CARET.md Editor T3: contract for the note-entry caret 2026-07-24 12:55:05 -04:00
CONTRACT_EDITOR_T4PRE_IR.md Editor T4-pre: the IR readiness contract, and the genesis-persistence table 2026-07-24 14:47:08 -04:00
CONTRACT_EDITOR_T4PRE_W2_GLYPHS.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
CONTRACT_EDITOR_T4_SPIKE.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
CONTRACT_FORMAT_EPOCH_MAJOR1.md Format epoch amended: pin 3c bounds the interval's conformance cost 2026-08-07 11:41:51 -04:00
CONTRACT_GENESIS_G1_INSTRUMENT.md Contract G1: one operation, and the two things that make from-empty correct 2026-07-24 18:04:30 -04:00
CONTRACT_GENESIS_G2A_SETTINGS.md Contract G2a round five: the sixth hand-maintained site, and locking Registered 2026-07-28 15:47:17 -04:00
CONTRACT_GENESIS_G2B_TUNING.md Sign t9 with a mutation that actually kills it 2026-07-29 10:18:57 -04:00
CONTRACT_GENESIS_G3A_ENTITIES.md G3a contract: ten source locators, corrected forward 2026-07-31 19:47:43 -04:00
CONTRACT_GENESIS_G3A_UNDO_REPAIR.md G3a undo repair: the tombstone branch was reachable all along 2026-07-29 18:21:45 -04:00
CONTRACT_GENESIS_G3B_MEASURE.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_GMINOR_IMPLEMENTATION.md Amend the G-minor contract: the [7f] oracle, and the PDFs the touch table missed 2026-07-28 18:59:00 -04:00
CONTRACT_GMINOR_VOCABULARY_AUDIT.md Audit contract amendments: a possible gate, and four scoping repairs 2026-07-28 18:08:55 -04:00
CONTRACT_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
CONTRACT_P13S6_PROMOTION.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
CONTRACT_P13S6_TEMPERAMENTS.md P13-S6: the tuning constructions, drafted -- and why sourcing was not enough 2026-07-22 11:50:06 -04:00
CONTRACT_P13S16_PROJECTION.md P13-S16 amendment 1, review round 1: two documents still described the old state 2026-08-10 17:50:42 +02:00
CONTRACT_P13S18_MATRIX.md P13-S18: the invariant-20 outcome matrix, and what the residue actually is 2026-07-31 17:05:49 -04:00
CONTRACT_P13S19_PARTIAL.md P13-S19: what a partial measure actually costs 2026-07-31 18:13:44 -04:00
CONTRACT_P13S22_TAGLOCK.md P13-S22 contract: M2's whole-test alternative was false 2026-07-31 19:30:21 -04:00
CONTRACT_P13S26_INVARIANT10_SURFACE.md P13-S26 amendment 4 EXECUTED: section 8.4's M27 sentence corrected 2026-08-11 20:52:34 +02:00
CONTRACT_P13S27_REDUCTION_AUTHORITY.md P13-S27: accept reduction authority implementation 2026-08-09 15:05:58 +02:00
CONTRACT_P13S29_VIOLATION_KIND.md P13-S29 RATIFIED; pins frozen, dispatched 2026-08-12 00:05:32 +02:00
CONTRACT_PUSH4B_3BII_IDENTITY.md Push 4b tranche 3b-ii: one SmuflVersion, and a live ordering bug dies with the homonym 2026-07-23 19:30:52 -04:00
CONTRACT_PUSH4B_3BI_WIRE.md Push 4b tranche 3b-i: the score wire opens schema major 3 2026-07-23 17:35:55 -04:00
CONTRACT_PUSH4B_ACCIDENTALS.md Push 4b tranche 3a: contract for the accidental vocabulary, and S10-S12 filed 2026-07-23 13:55:19 -04:00
CONTRACT_PUSH4B_ADAPTIVE.md Push 4b: ji-adaptive-5limit resolves, and the blocker was never HarmonicContext 2026-07-24 10:17:46 -04:00
CONTRACT_PUSH4B_PITCHSPACES.md Push 4b tranche 1: contract for the pitch-space slice 2026-07-22 17:08:00 -04:00
CONTRACT_PUSH4B_RESOLVER.md Push 4b tranche 2: contract for the in-memory tuning resolver 2026-07-23 10:06:25 -04:00
CONTRACT_PUSH4B_SPEC1.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
CONTRACT_PUSH4B_TEMPERAMENTS.md Push 4b tranche 2b: contract for the ten historical temperaments 2026-07-23 11:38:14 -04:00
CONTRACT_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
CONTRACT_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
DRAFT_P13S6_TEMPERAMENTS.md P13-S6 ratified: the lattice block, and an argument that did not survive arithmetic 2026-07-22 14:26:08 -04:00
EVIDENCE_P13S16_EXECUTION.md P13-S16 amendment 1, review round 1: two documents still described the old state 2026-08-10 17:50:42 +02:00
EVIDENCE_P13S26_EXECUTION.md P13-S26 amendment 3 EXECUTED: test 3 selects the normative clause 2026-08-11 20:39:41 +02:00
HANDOFF_2026-08-07.md P13-S26 post-acceptance reconciliation: the two documents held back 2026-08-11 19:31:35 +02:00
PASS11_RATIFICATION_LOG.md P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
PASS11_WORKLIST.md
…
PASS12_BATCH.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS12_RATIFICATION_LOG.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PASS12_WORKLIST.md Pass 12 G-pass: ratify the full batch (28 rows) — spec tranche 2026-07-07 10:23:30 -04:00
PASS13_CANDIDATES.md P13-S26 amendment 3 EXECUTED: test 3 selects the normative clause 2026-08-11 20:39:41 +02:00
PHASE2_F_WEEK0_WORKLIST.md
…
PHASE2_QUICKSTART.md
…
PLAN_EDITOR_APP.md Contract revision 6: round 1 was testing the wrong property on the wrong glyphs 2026-07-28 21:24:47 -04:00
PLAN_GENESIS_OPS.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
PLAN_GMINOR_SCHEMA_MINOR.md P13-S21: the two precondition reasons the wire spec never named 2026-07-30 20:57:59 -04:00
PLAN_P13S1_LABELS.md P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
PLAN_P13S2_CMN24.md P13-S2: the alteration is space-relative, and the core fails closed 2026-07-22 09:00:09 -04:00
PLAN_PUSH4B_TUNING.md Push 4b Wave 1a: three ratified corrections, and a citation that pointed the wrong way 2026-07-22 11:49:40 -04:00
PLAN_TEXTPROJ_DOCUMENT.md Text Projection: the document layer, and the equation closes 2026-07-21 15:05:28 -04:00
PLAN_TEXTPROJ_OPS.md Text Projection: the operation layer, and the tests that can see it fail 2026-07-21 13:43:09 -04:00
QUICKSTART.md G3b packet 3b: the documentation half, and the ladder closes 2026-07-30 20:45:27 -04:00
RULING_GENESIS_PERSISTENCE.md Editor T4-pre W2: the glyph-asset contract, and three parallelism claims get finer 2026-07-24 17:50:02 -04:00
binary_format.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
binary_format.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
core_spec.pdf P13-S26 EXECUTED: invariant 10 names its derived reference surface 2026-08-11 18:11:25 +02:00
core_spec.tex P13-S26 EXECUTED: invariant 10 names its derived reference surface 2026-08-11 18:11:25 +02:00
operation_catalog.pdf P13-S16 EXECUTED: StaffGroup.members becomes a maintained projection 2026-08-10 17:18:20 +02:00
operation_catalog.tex P13-S16 EXECUTED: StaffGroup.members becomes a maintained projection 2026-08-10 17:18:20 +02:00
quality_metric_catalog.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
quality_metric_catalog.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.pdf P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
reference_suite.tex P13-S1: every requirement is named, and now it is also numbered 2026-07-21 18:27:52 -04:00
text_projection.pdf Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00
text_projection.tex Container major 1: the format epoch carries base provenance 2026-08-07 12:51:14 -04:00