Commit Graph

3 Commits

Author SHA1 Message Date
Levi Neuwirth b65c927ac4 docs: record Themes Arc 4 completion
Advance canonical main and protocol state after PR #125, remove the
completed statusline lane from the active-work ledger, and mark the
first four roadmap arcs complete. Record Arc 5 stage 2 as the next
formal roadmap stage.

Co-Authored-By: Claude <noreply@anthropic.com>
2026-07-21 12:56:17 -04:00
Levi Neuwirth 968e01ae6a docs: add cross-machine active-work handoff
Add synchronized agent bootstraps and a volatile active-work ledger so
another machine can distinguish durable project state from open
branches, local checkpoints, machine-only providers, and incomplete
verification. Record githubsucks/main as the canonical development
line, refresh the #124/protocol-v17 handoff, correct the current
keybinding reference for compile mode, and mark the July roadmap as a
historical snapshot.
2026-07-20 10:51:34 -04:00
Levi Neuwirth 642505099a docs: July 2026 roadmap — ranked arcs; Arc 1 (LSP utility surface) active
State assessment from a five-way sweep (core editing/persistence, LSP,
GPU parity, extensibility/terminal, deferred-work inventory). Records
the decision to push Arc 1 (completion popup, LSP panels, semantic-token
auto-pull, signature trigger) with Arc 2 editing table-stakes
interleaved, plus the ranked remaining arcs and housekeeping list.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-07 11:00:09 -04:00