Advance the framing to Revision 6 and record the strengthened non-CRDT,
Ctrl-C, strict-operand, probe-throttling, and PID-cleanup contracts. Update the
durable and volatile checkpoints to implementation commit 154cb9f.
Advance the active and durable checkpoints to 69825d0 and clarify that every
spawned managed daemon enters the named reaper before connection or handshake
work can fail.
Advance the framing to Revision 5 and record the reviewed lifecycle, CLI, and
acceptance contracts. Update the durable and volatile handoffs with checkpoint
82355ca and the completed verification matrix.
Add the root --gpu broker, strict GPU entry points, daemon connect-or-start orchestration, process-group isolation, bounded retry, named child reaping, and a deterministic headless lifecycle probe. Cover the complete launch matrix with real subprocess acceptance, make root Cargo runs unambiguous, and document the coherent build and one-command workflow.
Record the approved managed-launch contract, daemon lifecycle and process-group rules, strict GPU CLI behavior, headless acceptance seam, and the complete acceptance matrix before implementation.