pmacs/tests
Levi Neuwirth 74ff468e74 feat(panels): outline, code-action picker, hover-doc (Arc 1b phase 2)
Pure Lua on the phase-1 substrate (framing Q#P5).

Outline: lsp.document-symbols (C-c o) opens *outline* -- the store's
FLAT symbol rows indent by their depth field with an LSP SymbolKind
tag; RET pushes the jump ring, restores the source buffer, and moves
to the symbol (M-, returns to the outline row, the references-panel
semantics).

Code actions: lsp.code-actions (C-c a) applies a single action
directly (previous behavior, now correct instead of lucky) and opens
the minibuffer dropdown when several are available -- 'N: title'
candidates; a bare typed index also accepts. The apply branch is
extracted as apply_code_action, shared by both paths. The m4_14/m4_15
acceptance tests (written against blind-first-apply; the fake LSP
returns two actions) now drive the picker: pump until the prompt is
live, type '1', RET -- same command-only action as before.

Hover doc: new lsp.hover-doc (C-c H) renders the full multi-line
hover contents into a non-visitable *lsp-help* panel; lsp.hover
(C-c h) keeps its one-line echo-area summary.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-07 21:30:52 -04:00
..
common M11.1: semantic-frontend protocol scaffolding (wire + capability) 2026-05-18 19:39:07 -04:00
fixtures V0.2-prerequisite pull-forward + M10.11 clean audit round 2026-05-18 10:31:31 -04:00
acceptance.rs Collapse if-let nests into let-chains (MSRV-1.95 collapsible_if sweep) 2026-05-18 14:29:36 -04:00
completion_popup_acceptance.rs fix(completion): address TUI-validation findings (LSP query gaps, scoping, prefix keys, window scope) 2026-07-07 16:54:14 -04:00
cua_region_acceptance.rs CUA type-over is a single undo step (Q#U1) 2026-06-15 20:00:53 -04:00
listview_acceptance.rs feat(panels): listview module, Q#P6 round-trip seam, references panel 2026-07-07 20:15:46 -04:00
m3_acceptance.rs Initial commit: v0.1.0 2026-05-03 19:51:06 -04:00
m4_acceptance.rs feat(panels): outline, code-action picker, hover-doc (Arc 1b phase 2) 2026-07-07 21:30:52 -04:00
m5_5_acceptance.rs Collapse if-let nests into let-chains (MSRV-1.95 collapsible_if sweep) 2026-05-18 14:29:36 -04:00
m5_6_acceptance.rs Initial commit: v0.1.0 2026-05-03 19:51:06 -04:00
m5_7_acceptance.rs CI fixes 2026-05-18 12:24:35 -04:00
m5_8_acceptance.rs tests: widen backoff timing signal 2026-05-25 13:32:54 -04:00
m5_perf_acceptance.rs M11.1: semantic-frontend protocol scaffolding (wire + capability) 2026-05-18 19:39:07 -04:00
m6_4_repl_acceptance.rs Fix PTY final-output drain race 2026-05-04 09:44:30 -04:00
m6_5_repl_acceptance.rs tests: quarantine macOS PTY marker cases 2026-05-25 13:02:46 -04:00
m6_7_scrollback_acceptance.rs Initial commit: v0.1.0 2026-05-03 19:51:06 -04:00
m6_8_multi_repl_acceptance.rs Collapse if-let nests into let-chains (MSRV-1.95 collapsible_if sweep) 2026-05-18 14:29:36 -04:00
m6_perf_acceptance.rs tests: tune M6 hosted perf profile 2026-05-25 13:43:28 -04:00
m7_3_acceptance.rs Fix CI and Documentation issues 2026-05-04 10:19:19 -04:00
m7_5_acceptance.rs fix(packages): basename-collision reject, SHA-256 cache key, timeout thread join, commit→revision, dead-code (F-005/F-009–F-012) 2026-07-03 18:47:23 -04:00
m7_6_acceptance.rs fix(packages): basename-collision reject, SHA-256 cache key, timeout thread join, commit→revision, dead-code (F-005/F-009–F-012) 2026-07-03 18:47:23 -04:00
m7_7_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m7_8_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m7_9_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m7_10_acceptance.rs fix(packages): basename-collision reject, SHA-256 cache key, timeout thread join, commit→revision, dead-code (F-005/F-009–F-012) 2026-07-03 18:47:23 -04:00
m7_11_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m7_review_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m8_1_acceptance.rs Pin toolchain to 1.95.0 + mechanical clippy/rustc fixes 2026-05-18 11:38:57 -04:00
m8_1c_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m8_1d_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m8_2_acceptance.rs tests: stabilize hosted perf gates 2026-05-25 13:20:18 -04:00
m8_3_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m8_5_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m8_6_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m8_7_acceptance.rs M7 tail: package system, audit lint, lockfile, resolver 2026-05-07 16:50:37 -04:00
m8_9_acceptance.rs V0.2-prerequisite pull-forward + M10.11 clean audit round 2026-05-18 10:31:31 -04:00
m8_10_acceptance.rs V0.2-prerequisite pull-forward + M10.11 clean audit round 2026-05-18 10:31:31 -04:00
m9_1_acceptance.rs T M4.5 async bridge: LSP requests settle async-runtime jobs 2026-05-18 19:36:17 -04:00
m9_2_acceptance.rs style: from_secs(1) for the m9_2 harvest wait (clippy duration units) 2026-06-10 12:07:08 -04:00
m9_3_acceptance.rs Collapse if-let nests into let-chains (MSRV-1.95 collapsible_if sweep) 2026-05-18 14:29:36 -04:00
m9_4_acceptance.rs M9 ship gate 2026-05-09 15:04:23 -04:00
m9_5_acceptance.rs M9 ship gate 2026-05-09 15:04:23 -04:00
m9_6_acceptance.rs M9 ship gate 2026-05-09 15:04:23 -04:00
m9_7_acceptance.rs M9 ship gate 2026-05-09 15:04:23 -04:00
m9_8_acceptance.rs M9 ship gate 2026-05-09 15:04:23 -04:00
m10_2_perf.rs M10.10 ship gate 2026-05-13 16:28:46 -04:00
m10_10_perf.rs M10.10 ship gate 2026-05-13 16:28:46 -04:00
m10_10_postcard_unknown_variant.rs M10.10 ship gate 2026-05-13 16:28:46 -04:00
m10_11_acceptance.rs M11.1: semantic-frontend protocol scaffolding (wire + capability) 2026-05-18 19:39:07 -04:00
m10_11_perf.rs M10.11: adversarial two-laptop acceptance + jitter; the M10 arc verified 2026-05-15 20:51:00 -04:00
m11_5_semantic_acceptance.rs M11.5: semantic frontend<->instance glue (SemanticClient + e2e) 2026-05-18 21:24:36 -04:00
overlay_reattach_acceptance.rs fix(panels): follow active buffer on semantic frontends; re-attach overlays on switch 2026-07-07 20:46:50 -04:00
worker_shutdown_acceptance.rs fix(completion): address TUI-validation findings (LSP query gaps, scoping, prefix keys, window scope) 2026-07-07 16:54:14 -04:00