The lane was 28 commits behind. Merged rather than rebased, per the
#135/#137 precedent: the PR is awaiting review rounds and a rebase would
break every review anchor.
The only conflict was docs/active-work.md, where both sides add lanes.
Kept both: main's lanes verbatim, with this lane leading since it is the
one in flight. The conflict was pre-existing rather than introduced by
the dired or Lean 4 ledger commits -- it already conflicted against main
at e745068.
The integration surface, derived from git diff merge-base..main rather
than from another PR's file list, is pmacs-gpu/src/main.rs: main gained
72 lines there from e547a90, the minimap all-blank-slab divide-by-zero
fix, and this lane rewrites large parts of the same file. Git auto-merged
it textually. A clean auto-merge is not evidence the tree compiles, so
the full gate suite is what discharges it; the ledger records the
post-integration numbers separately from the pre-integration ones, which
described a tree 28 commits behind.