epiphany/crates
Levi Neuwirth 3ef1a8abd9 Pass-12 batch: mark the resolved I-series rows done
A status sweep: the I-series Pass-12 candidates are all closed, but the tracker
and two crate DECISIONS.md files still described them as open.

  - PASS12_BATCH.md: P12-I1 (structural-placeholder pipeline) is resolved by I-1
    -- to_constrained now builds real notation and the Engraver re-spaces it;
    P12-I3 (BRAVURA_METRICS approximations) is resolved by I-4a -- metrics
    re-extracted from the same pinned 1.392 font, containment-tested. Both rows
    struck through and marked done.
  - render-svg/DECISIONS.md: fixed the stale P12-I2 bullet, which still said the
    MUSCLOID derivation was unwired and the determinism crate exposed no tag (a
    miss from the P12-I2 commit); now marked resolved.
  - engrave/DECISIONS.md: its P12 section described P12-I1/I3 as open and omitted
    I2; rewritten so all three read resolved.

The batch's top-level Status stays OPEN -- the H-series and K-series candidates
remain. Docs-only; no code change.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-27 12:53:36 -04:00
..
epiphany-bundle Pass 11 audit follow-up: honest LayoutObjectId status + doc/test gaps 2026-06-22 10:02:05 -04:00
epiphany-core Agent I-0: real clef + key-signature data in the core graph 2026-06-26 10:31:16 -04:00
epiphany-determinism P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
epiphany-engrave Pass-12 batch: mark the resolved I-series rows done 2026-06-27 12:53:36 -04:00
epiphany-layout-ir P12-I2: wire the ratified MUSCLOID layout-object id derivation 2026-06-27 12:46:19 -04:00
epiphany-ops Agent K M2e review follow-up: tighten catalog accuracy + container creates 2026-06-26 09:52:13 -04:00
epiphany-render-svg Pass-12 batch: mark the resolved I-series rows done 2026-06-27 12:53:36 -04:00
epiphany-testkit Agent I Phase 2-3: engrave recognizable notation from Score to SVG 2026-06-26 20:46:33 -04:00