Commit Graph

1 Commits

Author SHA1 Message Date
Levi Neuwirth 2469c34676 add TECHNICAL.md engineering roadmap
Phase 0 (C-enabling pipeline work) → Phase 1 (Paper C clinical
validation) → Phase 2 (open-source release + Paper A), with Track 2
(clinical platform) as a contingent side track. Mirrors RESEARCH.md but
for engineering scope rather than methodology.
2026-04-18 17:00:36 -04:00